Project title: Yeu-Noirmoutier Offshore Windfarm  

Project location: Offshore islands of Yeu and Noirmoutier, France

Client: Eoliennes en Mer Yeu-Noirmoutier (EMYN) 

  • Marine Warranty Survey (MWS)
  • Transportation and installation assurance
  • Offshore Substation (OSS) package
  • Monopile and Transition Piece foundation package
  • Inter-Array Cable (IAC) package
  • Wind Turbine Generator (WTG) package

Project Summary:

ABL was appointed by Eoliennes en Mer Yeu-Noirmoutier (EMYN) to provide Marine Warranty Surveyor (MWS) services for the construction, transportation and installation of the 488 MW Yeu-Noirmoutier Offshore Windfarm, located off the islands of Yeu and Noirmoutier, France, in water depths of 20 m to 35 m.

ABL delivered MWS services across four principal packages: the Offshore Substation (OSS), monopile and transition piece foundations, Inter-Array Cables (IAC), and Wind Turbine Generators (WTG).

The wind farm comprises 61 Siemens Gamesa 8 MW turbines. Its major components were fabricated and marshalled across Europe and Asia before offshore installation using specialist heavy-lift, jack-up and cable-lay vessels.

Project Challenges

Key challenges included:

A rocky seabed requiring large-diameter monopiles and drilling during foundation installation.

Potentially high impact loads on jack-up legs during operations on the rocky seabed.

WTG loadout operations carried out
in floating mode.

Coordination of transport and installation activities across the OSS, foundation, IAC and WTG packages.

Our Solutions

ABL deployed a dedicated French-based MWS team to provide integrated assurance across the Offshore Substation, foundations, inter-array cables and wind turbine packages. Leveraging local expertise, regional offshore wind experience and close coordination with installation contractors, ABL reviewed transport and installation methodologies, assessed operational risks and supported safe execution in the challenging Gulf of Biscay environment.

ABL’s scope included:

  • MWS assurance for the four-pin-pile OSS, including an approximately 2,000-tonne jacket and 2,500-tonne topside, lifted and installed by the heavy-lift vessel Pioneering Spirit.
  • Review and attendance for monopiles weighing approximately 500 to 1,000 tonnes and 7.0 m in diameter, fabricated in Dajin, China, and transported to La Rochelle aboard Blue Marlin and Black Marlin.
  • Assurance for transition pieces weighing approximately 500 tonnes and foundation installation by the heavy-lift jack-up vessel Innovation, using MODIGA and Herrenknecht drilling equipment.
  • MWS support for Prysmian inter-array cables installed by Louis Dreyfus Armateurs using a converted DP2 platform supply vessel, with cast-iron shell protection laid directly on the seabed.
  • Assurance for the loadout, transportation and installation of 61 Siemens Gamesa 8 MW turbines by the heavy-lift jack-up vessel Vole au Vent from Saint-Nazaire.

End Result

ABL delivered a consistent Marine Warranty framework across all major transport and installation activities for the 488 MW Yeu-Noirmoutier Offshore Windfarm. Combining local knowledge with offshore wind expertise, ABL helped the client manage complex interfaces, challenging seabed conditions and weather-sensitive operations throughout the project lifecycle.

Our Value

In-Country Expertise: Local French expertise and a responsive pool of surveyors supported activities across multiple mobilisation locations.

Experience that Matters: Regional experience helped address challenging weather, rocky seabed conditions and weather-restricted
jack-up operations.

Marine surveyor looking across the sea to an oil rig and vessel

Marine Warranty Survey

Receive an accurate and reliable marine warranty survey (MWS) for your project. As the world leader in marine warranty surveys (MWS), we provide technical surveys for the largest and most complex marine construction projects. We’ve also worked on major onshore construction projects requiring marine transportation of large modularised and pre-assembled units and other project components. […]
MWS: Renewables

MWS: Renewables

ABL is the pre-eminent provider of Marine Warranty Survey (MWS) services for the renewable energy industry, with a particularly strong track record and legacy in supporting offshore wind farm development from the early stages of this technology. We have acted as MWS on over 90 offshore wind farms, both fixed-bottomed and floating, across Europe, North […]