icon-casualty

+44 (0)20 7264 3250

Casualty Response

Get emergency support now

Incident at a Major Petroleum Terminal, France

During one major 2016 project, we were instructed to carry out an onsite inspection and provide technical advice to a London based P&I Club following a substantial FOD incident at a major petroleum terminal, in southern France. Inspecting Impact Damage An oil/chemical tanker during berthing manoeuvre had struck a suspended quay and its marine loading […]

LOC opens central Paris office – the first in France

LOC has announced the expansion of its European operations with the opening of its Paris office. The office is the first LOC operation based in France and is accessibly located in the Tour de l’Horloge at the Gare de Lyon, one of two main Paris train stations. Established to manage both global and local projects […]

MWS for Lavrio-Serifos and Serifos-Milos Interconnectors

Our scope of work ABL’s scope of work consisted of providing MWS services for the cable load out, shore ends pull-in, laying, offshore jointing, and lay burial, including jetting and trenching. The team of ABL France performed the work with the support of ABL Bulgaria for offshore attendance and ABL Greece for onshore attendance and […]

Invest in African Energy

Meet ABL at Invest in African Energy & discuss technical services, risk management and local delivery to drive investor confidence in projects and assets.

Maxime Pottier

17 years of experience in the Offshore Oil & Gas and Renewables industry gained through various projects all over the world: France, Angola, Norway, the Gulf of Mexico, Egypt, and the Ivory Coast.  Involved in tendering activities, FEED / Basic Engineering, T&I, EPCI projects and offshore operations. This experience has been reinforced by several offshore missions […]

Port-la-Nouvelle: Wet storage solution for floating offshore wind turbines (FOWT)

Ports and harbours consulting to support feasible port infrastructure to support France’s floating offshore wind market. Our Scope of Work ABL’s work was to define the wet storage solutions for 20 MW floating wind turbines inside and outside of the port. The work was divided into two phases. Phase 1 Aimed to define solutions for […]