{"id":6375,"date":"2018-10-09T08:00:27","date_gmt":"2018-10-09T07:00:27","guid":{"rendered":"http:\/\/aqualisoffshore.com\/?p=6375"},"modified":"2022-01-24T08:31:46","modified_gmt":"2022-01-24T08:31:46","slug":"reactivation-inspections","status":"publish","type":"post","link":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/","title":{"rendered":"How to Survive a Rig Inspection: Part 3"},"content":{"rendered":"<p class=\"big\">In this 16 part series, our head of <a href=\"http:\/\/aqualisbraemar.com\/services\/rig-inspection-services\/\">Rig Inspection Services<\/a> Steven Lee shares tips on how operators and owners can get through rig inspections with flying colours \u2013 and which pitfalls to avoid! Mr Lee has more than a hundred rig inspections under his belt, from all parts of the world. In this third chapter, we look at reactivation inspections.<\/p>\n<h2 class=\"news-footer\">Part 3: Reactivation Inspections<\/h2>\n<p>As we discussed during the previous rig preservation blog, reactivation and preservation are two sides of the same coin. Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig&#8217;s systems should not be taken for granted.<\/p>\n<p>Experience from conducting reactivation inspections on both warm stacked and longer-term cold stacked rigs is that you will have equipment failures. Typically these will be small, relatively inexpensive components.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-6376 size-full\" src=\"http:\/\/aqualisbraemar.com\/wordpress\/wp-content\/uploads\/2018\/09\/Reactivation.jpg\" alt=\"Reactivation Inspections\" width=\"1200\" height=\"800\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation.jpg 1200w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation-300x200.jpg 300w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation-1024x683.jpg 1024w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation-768x512.jpg 768w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation-390x260.jpg 390w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>These failures can have more impact on reactivation timelines than hardware budgets, as often these inexpensive components are not readily available. So the lesson that has been learned during reactivation is the sooner and more rigorously equipment function testing can be done, the sooner any equipment failures can be identified without ultimately impacting the project&#8217;s deadline.<\/p>\n<p>Another important lesson is that as we develop more complex hardware, which relies largely upon firmware and software systems, such systems need to be maintained at the version they were at before preservation.<\/p>\n<p>Manufacturers are continuously striving to improve firmware and software. As such, system upgrades are commonplace in much of our rig systems. We need to resist the temptation to cut corners and have upgrades installed as we reactivate. Failure to follow this method can lead to hugely time-consuming problems, as any faults encountered cannot be identified as a result of software or firmware upgrades.<\/p>\n<p>This leads to another problem area during rig reactivation, which is addressing all the equipment technical bulletins, safety bulletins and the like from the equipment manufacturers. There needs to be a documented process ensuring that this is being addressed and that important upgrades\/modifications etc. are not inadvertently missed.<\/p>\n<p>Reactivation inspections focus heavily upon equipment testing and review of equipment that requires recertification, looking specifically at any findings and how they have been addressed. Planned Maintenance systems will also come under heavy scrutiny. Inspection teams will look at how calendar-based maintenance during the preservation period was addressed, if there are any backlogs of maintenance and how that is being addressed.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig&#8217;s systems should not be taken for granted.<\/p>\n","protected":false},"author":2,"featured_media":6376,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[6,846],"tags":[],"sector":[],"service":[],"company":[],"class_list":["post-6375","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-rig-inspection"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How to Survive a Rig Inspection: Part 3 - Reactivation Inspections<\/title>\n<meta name=\"description\" content=\"Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig&#039;s systems should not be taken for granted.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Survive a Rig Inspection: Part 3\" \/>\n<meta property=\"og:description\" content=\"Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig&#039;s systems should not be taken for granted.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-09T07:00:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-01-24T08:31:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"George Lenox\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"George Lenox\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/\"},\"author\":{\"name\":\"George Lenox\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/1a54a8404066452ce3b217824eadc7f5\"},\"headline\":\"How to Survive a Rig Inspection: Part 3\",\"datePublished\":\"2018-10-09T07:00:27+00:00\",\"dateModified\":\"2022-01-24T08:31:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/\"},\"wordCount\":406,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/Reactivation.jpg\",\"articleSection\":[\"Blog\",\"Rig Inspection\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/\",\"name\":\"How to Survive a Rig Inspection: Part 3 - Reactivation Inspections\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/Reactivation.jpg\",\"datePublished\":\"2018-10-09T07:00:27+00:00\",\"dateModified\":\"2022-01-24T08:31:46+00:00\",\"description\":\"Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig's systems should not be taken for granted.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/Reactivation.jpg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/Reactivation.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Reactivation Inspections\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/blog\\\/reactivation-inspections\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Survive a Rig Inspection: Part 3\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/1a54a8404066452ce3b217824eadc7f5\",\"name\":\"George Lenox\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b7446374cbf3f86062dfe48e7ab6fb0ba56096e09d6e5daab9dfedbb99defb0?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b7446374cbf3f86062dfe48e7ab6fb0ba56096e09d6e5daab9dfedbb99defb0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9b7446374cbf3f86062dfe48e7ab6fb0ba56096e09d6e5daab9dfedbb99defb0?s=96&d=mm&r=g\",\"caption\":\"George Lenox\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How to Survive a Rig Inspection: Part 3 - Reactivation Inspections","description":"Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig's systems should not be taken for granted.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/","og_locale":"en_GB","og_type":"article","og_title":"How to Survive a Rig Inspection: Part 3","og_description":"Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig's systems should not be taken for granted.","og_url":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/","og_site_name":"ABL","article_published_time":"2018-10-09T07:00:27+00:00","article_modified_time":"2022-01-24T08:31:46+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation.jpg","type":"image\/jpeg"}],"author":"George Lenox","twitter_card":"summary_large_image","twitter_misc":{"Written by":"George Lenox","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/#article","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/"},"author":{"name":"George Lenox","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/1a54a8404066452ce3b217824eadc7f5"},"headline":"How to Survive a Rig Inspection: Part 3","datePublished":"2018-10-09T07:00:27+00:00","dateModified":"2022-01-24T08:31:46+00:00","mainEntityOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/"},"wordCount":406,"commentCount":0,"publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation.jpg","articleSection":["Blog","Rig Inspection"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/","url":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/","name":"How to Survive a Rig Inspection: Part 3 - Reactivation Inspections","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation.jpg","datePublished":"2018-10-09T07:00:27+00:00","dateModified":"2022-01-24T08:31:46+00:00","description":"Reactivation inspections are similar to a newbuild acceptance program, in that the basic functionality of a rig's systems should not be taken for granted.","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation.jpg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2018\/09\/Reactivation.jpg","width":1200,"height":800,"caption":"Reactivation Inspections"},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/all-media\/blog\/reactivation-inspections\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"How to Survive a Rig Inspection: Part 3"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/1a54a8404066452ce3b217824eadc7f5","name":"George Lenox","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/9b7446374cbf3f86062dfe48e7ab6fb0ba56096e09d6e5daab9dfedbb99defb0?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9b7446374cbf3f86062dfe48e7ab6fb0ba56096e09d6e5daab9dfedbb99defb0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9b7446374cbf3f86062dfe48e7ab6fb0ba56096e09d6e5daab9dfedbb99defb0?s=96&d=mm&r=g","caption":"George Lenox"}}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/6375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/comments?post=6375"}],"version-history":[{"count":1,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/6375\/revisions"}],"predecessor-version":[{"id":24617,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/6375\/revisions\/24617"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/6376"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=6375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/categories?post=6375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/tags?post=6375"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=6375"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=6375"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=6375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}