{"id":39305,"date":"2023-02-07T10:06:08","date_gmt":"2023-02-07T10:06:08","guid":{"rendered":"https:\/\/abl-group.com\/abl\/?p=39305"},"modified":"2023-02-07T10:06:08","modified_gmt":"2023-02-07T10:06:08","slug":"abl-group-wins-contracts-for-french-round-2-offshore-wind-farms","status":"publish","type":"post","link":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/","title":{"rendered":"ABL Group wins contracts for French Round 2 offshore wind farms"},"content":{"rendered":"\n<p><strong>ABL Group (ABL)\u2019s Paris office has been awarded contracts to provide <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/\">marine warranty survey<\/a> (MWS) services to support the development of two Round 2 French offshore wind farms (OFW) with a combined capacity of nearly 1 GW.<\/strong><\/p>\n\n\n\n<p>The two (2) offshore wind farms are the 496 MW Iles d\u2019Yeu et de Noirmoutier and the 496MW DieppeLe Tr\u00e9port, respectively being developed by \u00c9oliennes en Mer \u00celes d\u2019Yeu et de Noirmoutier (EMYN) and \u00c9oliennes en Mer Dieppe Le Tr\u00e9port (EMDT). Both companies are partnerships between Ocean Winds (the 50\/50 joint venture between ENGIE and EDP Renewables), Sumitomo Corporation, Banque des Territoires and Vend\u00e9e Energie (for EMYN wind farm).<\/p>\n\n\n\n<p>Under the terms of the agreement, ABL\u2019s Paris office will review and approve the loadout, marine transportation, and installation operations for the components of the substation, foundations, inter array cables and wind turbine generators. ABL will also inspect and approve the marine spread intended to be used during the construction &#8211; meaning all the barges, tugs, floating crane vessels and jack-up vessels.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2017\/10\/Fabien-Thomas-rs-scaled-1-953x1024.jpg\" alt=\"\" class=\"wp-image-1287\" width=\"201\" height=\"216\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2017\/10\/Fabien-Thomas-rs-scaled-1-953x1024.jpg 953w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2017\/10\/Fabien-Thomas-rs-scaled-1-279x300.jpg 279w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2017\/10\/Fabien-Thomas-rs-scaled-1-768x825.jpg 768w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2017\/10\/Fabien-Thomas-rs-scaled-1-1430x1536.jpg 1430w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2017\/10\/Fabien-Thomas-rs-scaled-1-1906x2048.jpg 1906w\" sizes=\"auto, (max-width: 201px) 100vw, 201px\" \/><figcaption class=\"wp-element-caption\">Fabien Thomas<\/figcaption><\/figure>\n<\/div>\n\n\n<p>\u201cWe are delighted to be awarded these two contracts by EMYN and EMDT. This follows our past project wins on the three offshore windfarm projects of Round 1 \u2013 respectively Saint-Nazaire OWF, F\u00e9camp OWF and Courseulles OWF \u2013 in France. It reaffirms ABL\u2019s recognised reputation as a leading provider of MWS services in France, and more widely for the whole offshore wind industry,\u201d says Fabien Thomas, Head of Marine Warranty services at ABL France.<\/p>\n\n\n\n<p>The EMYN offshore wind farm will be located at 11.7 kilometres from Yeu island and 16.5 kilometres from Noirmoutier island, in waters ranging between 19 and 36 metres. It will consist of 62 wind turbines of 8 MW each, installed on monopiles, and one offshore substation, connected via inter-array cables.<\/p>\n\n\n\n<p>The EMDT project will be located at 15.5 kilometres from Tr\u00e9port and 17 kilometres from Dieppe, in waters ranging between 14 and 24 metres. It will consist of 62 x 8 MW wind turbines installed on jacket foundations, and one offshore substation, connected via inter array cables.<\/p>\n\n\n\n<p>The first offshore construction activities should start during 2023. Once online, each project should be able to provide green energy to cover the annual needs of approximately 800,000 persons.<\/p>\n\n\n\n<p>ABL is part of Oslo-listed ABL Group ASA, an independent energy and marine consultancy group to the global renewables, maritime and oil and gas sectors.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-limegreen-background-color has-background wp-element-button\" href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/\">Explore MWS services<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>ABL Group\u2019s Paris office has been awarded contracts to provide marine warranty survey services to support the development of two Round 2 French offshore wind farms with a combined capacity of nearly 1 GW.<\/p>\n","protected":false},"author":7,"featured_media":39307,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[],"sector":[108,833],"service":[709],"company":[724],"class_list":["post-39305","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","sector-maritime","sector-offshore-wind","service-marine-warranty-survey","company-abl"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABL Group wins contracts for French Round 2 offshore wind farms - ABL<\/title>\n<meta name=\"description\" content=\"ABL Group\u2019s Paris office will support the development of two Round 2 French offshore wind farms with a combined capacity of nearly 1 GW.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABL Group wins contracts for French Round 2 offshore wind farms\" \/>\n<meta property=\"og:description\" content=\"ABL Group\u2019s Paris office will support the development of two Round 2 French offshore wind farms with a combined capacity of nearly 1 GW.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-07T10:06:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/02\/TRE-Vue3D-2-002.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Tunkina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@george.lenox@aqualisbraemar.com\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Tunkina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/\"},\"author\":{\"name\":\"Katie Tunkina\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\"},\"headline\":\"ABL Group wins contracts for French Round 2 offshore wind farms\",\"datePublished\":\"2023-02-07T10:06:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/\"},\"wordCount\":396,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/TRE-Vue3D-2-002.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/\",\"name\":\"ABL Group wins contracts for French Round 2 offshore wind farms - ABL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/TRE-Vue3D-2-002.jpg\",\"datePublished\":\"2023-02-07T10:06:08+00:00\",\"description\":\"ABL Group\u2019s Paris office will support the development of two Round 2 French offshore wind farms with a combined capacity of nearly 1 GW.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/TRE-Vue3D-2-002.jpg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/TRE-Vue3D-2-002.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABL Group wins contracts for French Round 2 offshore wind farms\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\",\"name\":\"Katie Tunkina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"caption\":\"Katie Tunkina\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/george.lenox@aqualisbraemar.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABL Group wins contracts for French Round 2 offshore wind farms - ABL","description":"ABL Group\u2019s Paris office will support the development of two Round 2 French offshore wind farms with a combined capacity of nearly 1 GW.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/","og_locale":"en_GB","og_type":"article","og_title":"ABL Group wins contracts for French Round 2 offshore wind farms","og_description":"ABL Group\u2019s Paris office will support the development of two Round 2 French offshore wind farms with a combined capacity of nearly 1 GW.","og_url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/","og_site_name":"ABL","article_published_time":"2023-02-07T10:06:08+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/02\/TRE-Vue3D-2-002.jpg","type":"image\/jpeg"}],"author":"Katie Tunkina","twitter_card":"summary_large_image","twitter_creator":"@george.lenox@aqualisbraemar.com","twitter_misc":{"Written by":"Katie Tunkina","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/#article","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/"},"author":{"name":"Katie Tunkina","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd"},"headline":"ABL Group wins contracts for French Round 2 offshore wind farms","datePublished":"2023-02-07T10:06:08+00:00","mainEntityOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/"},"wordCount":396,"commentCount":0,"publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/02\/TRE-Vue3D-2-002.jpg","articleSection":["News"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/","url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/","name":"ABL Group wins contracts for French Round 2 offshore wind farms - ABL","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/02\/TRE-Vue3D-2-002.jpg","datePublished":"2023-02-07T10:06:08+00:00","description":"ABL Group\u2019s Paris office will support the development of two Round 2 French offshore wind farms with a combined capacity of nearly 1 GW.","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/02\/TRE-Vue3D-2-002.jpg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/02\/TRE-Vue3D-2-002.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-group-wins-contracts-for-french-round-2-offshore-wind-farms\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"ABL Group wins contracts for French Round 2 offshore wind farms"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd","name":"Katie Tunkina","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","caption":"Katie Tunkina"},"sameAs":["https:\/\/x.com\/george.lenox@aqualisbraemar.com"]}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/39305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/comments?post=39305"}],"version-history":[{"count":2,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/39305\/revisions"}],"predecessor-version":[{"id":39309,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/39305\/revisions\/39309"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/39307"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=39305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/categories?post=39305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/tags?post=39305"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=39305"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=39305"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=39305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}