{"id":19041,"date":"2021-06-10T12:05:05","date_gmt":"2021-06-10T11:05:05","guid":{"rendered":"https:\/\/abl-group.com\/abl\/?p=19041"},"modified":"2021-06-10T12:05:06","modified_gmt":"2021-06-10T11:05:06","slug":"aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project","status":"publish","type":"post","link":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/","title":{"rendered":"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project"},"content":{"rendered":"\n<p><strong><a href=\"http:\/\/www.hdec.com\/en\/index.aspx\">PowerChina Huadong Engineering Co. Ltd. <\/a>has appointed <a href=\"https:\/\/abl-group.com\/abl\/\">AqualisBraemar LOC<\/a> as <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/mws-renewables\/\">marine warranty surveyor <\/a>on phases 2 and 3 on the Binh Dai Wind Farm Development offshore Vietnam.<\/strong><\/p>\n\n\n\n<p>Phases 2 and 3 include the installation of 24 units of <a href=\"http:\/\/www.goldwindglobal.com\/\">Goldwind<\/a> turbines.<\/p>\n\n\n\n<p>AqualisBraemar LOC\u2019s scope of work includes the technical review and approval of all project documentation pertaining to the marine transportation and installation operations of wind farm components, on site attendance to oversee all critical marine operations, and vessel <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-surveys-inspections-and-audits\/\">suitability surveys<\/a> of all proposed offshore support vessels, including semi-submersible installation vessels. The plan is to complete the work between now and October this year. \u00a0<\/p>\n\n\n\n<p>Previously, PowerChina Huadong Engineering Co. Ltd engaged AqualisBraemar LOC to provide marine warranty services on <a href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/loc-singapore-awarded-marine-warranty-survey-contract-for-binh-dai-phase-1-owf\/\">phase 1 of the offshore wind farm construction<\/a>. The Binh Dai offshore wind power plant has approximately 310MW with 74 offshore WTGs to be installed in 8 phases.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>\u201cTo win the 2<sup>nd<\/sup> and 3<sup>rd<\/sup> phases at Binh Dai 1 is testament of the work we are currently providing on phase 1 of the project. We are really pleased to have the opportunity to continue our cooperation with such an ambitious client as PowerChina Huadong Engineering Co. Ltd.&#8221;<\/p><cite>Donny Ng, Business Development Director, AqualisBraemar LOC Singapore <\/cite><\/blockquote>\n\n\n\n<p>Since the beginning of 2020, AqualisBraemar LOC has been appointed marine warranty surveyor on seven offshore wind farms under construction in Vietnamese waters, with sister companies <a href=\"https:\/\/owcltd.com\/\">OWC <\/a>and <a href=\"https:\/\/www.longitude-engineering.com\/\">Longitude<\/a> providing engineering and advisory services on a further three wind farms offshore Vietnam.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>\u201cOur growing track-record in Vietnamese <a href=\"https:\/\/abl-group.com\/abl\/renewable-energy-engineering-consultants\/offshore-wind\/\">offshore wind<\/a> is a reflection of both the global reputation we have cultivated as a leading marine warranty service provider for the offshore wind sector, as well as of our recognised technical expertise in supporting the accelerated development of offshore wind across South East Asia.\u201d<\/p><cite>Donny Ng<\/cite><\/blockquote>\n\n\n\n<p>AqualisBraemar LOC has over 800 technical staff and specialist consultants in 303 locations worldwide, including 60 offices across 38 countries.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PowerChina Huadong Engineering Co. Ltd. has appointed AqualisBraemar LOC as marine warranty surveyor on phases 2 and 3 on the Binh Dai Wind Farm Development offshore Vietnam. Phases 2 and 3 include the installation of 24 units of Goldwind turbines. AqualisBraemar LOC\u2019s scope of work includes the technical review and approval of all project documentation [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":6790,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[],"sector":[106],"service":[],"company":[],"class_list":["post-19041","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","sector-renewables"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project - ABL<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project\" \/>\n<meta property=\"og:description\" content=\"PowerChina Huadong Engineering Co. Ltd. has appointed AqualisBraemar LOC as marine warranty surveyor on phases 2 and 3 on the Binh Dai Wind Farm Development offshore Vietnam. Phases 2 and 3 include the installation of 24 units of Goldwind turbines. AqualisBraemar LOC\u2019s scope of work includes the technical review and approval of all project documentation [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-10T11:05:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-10T11:05:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2019\/03\/India-offshore-wind.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Tunkina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@george.lenox@aqualisbraemar.com\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Tunkina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/\"},\"author\":{\"name\":\"Katie Tunkina\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\"},\"headline\":\"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project\",\"datePublished\":\"2021-06-10T11:05:05+00:00\",\"dateModified\":\"2021-06-10T11:05:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/\"},\"wordCount\":314,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/India-offshore-wind.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/\",\"name\":\"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project - ABL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/India-offshore-wind.jpg\",\"datePublished\":\"2021-06-10T11:05:05+00:00\",\"dateModified\":\"2021-06-10T11:05:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/India-offshore-wind.jpg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/India-offshore-wind.jpg\",\"width\":1000,\"height\":667,\"caption\":\"Indian offshore wind\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\",\"name\":\"Katie Tunkina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"caption\":\"Katie Tunkina\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/george.lenox@aqualisbraemar.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project - ABL","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/","og_locale":"en_GB","og_type":"article","og_title":"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project","og_description":"PowerChina Huadong Engineering Co. Ltd. has appointed AqualisBraemar LOC as marine warranty surveyor on phases 2 and 3 on the Binh Dai Wind Farm Development offshore Vietnam. Phases 2 and 3 include the installation of 24 units of Goldwind turbines. AqualisBraemar LOC\u2019s scope of work includes the technical review and approval of all project documentation [&hellip;]","og_url":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/","og_site_name":"ABL","article_published_time":"2021-06-10T11:05:05+00:00","article_modified_time":"2021-06-10T11:05:06+00:00","og_image":[{"width":1000,"height":667,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2019\/03\/India-offshore-wind.jpg","type":"image\/jpeg"}],"author":"Katie Tunkina","twitter_card":"summary_large_image","twitter_creator":"@george.lenox@aqualisbraemar.com","twitter_misc":{"Written by":"Katie Tunkina","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/#article","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/"},"author":{"name":"Katie Tunkina","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd"},"headline":"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project","datePublished":"2021-06-10T11:05:05+00:00","dateModified":"2021-06-10T11:05:06+00:00","mainEntityOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/"},"wordCount":314,"commentCount":0,"publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2019\/03\/India-offshore-wind.jpg","articleSection":["News"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/","url":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/","name":"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project - ABL","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2019\/03\/India-offshore-wind.jpg","datePublished":"2021-06-10T11:05:05+00:00","dateModified":"2021-06-10T11:05:06+00:00","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2019\/03\/India-offshore-wind.jpg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2019\/03\/India-offshore-wind.jpg","width":1000,"height":667,"caption":"Indian offshore wind"},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/aqualisbraemar-loc-hired-on-next-phases-of-vietnam-offshore-wind-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"AqualisBraemar LOC hired on next phases of Vietnam Offshore Wind Project"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd","name":"Katie Tunkina","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","caption":"Katie Tunkina"},"sameAs":["https:\/\/x.com\/george.lenox@aqualisbraemar.com"]}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/19041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/comments?post=19041"}],"version-history":[{"count":2,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/19041\/revisions"}],"predecessor-version":[{"id":19044,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/19041\/revisions\/19044"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/6790"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=19041"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/categories?post=19041"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/tags?post=19041"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=19041"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=19041"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=19041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}