{"id":126335,"date":"2026-04-15T08:48:42","date_gmt":"2026-04-15T07:48:42","guid":{"rendered":"https:\/\/abl-group.com\/abl\/?p=126335"},"modified":"2026-04-15T15:00:28","modified_gmt":"2026-04-15T14:00:28","slug":"abl-appointed-to-390-mw-south-korean-offshore-wind-project","status":"publish","type":"post","link":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/","title":{"rendered":"ABL appointed to 390 MW South Korean offshore wind project"},"content":{"rendered":"\n<p><a href=\"https:\/\/abl-group.com\/abl\/\"><strong>Energy and marine consultancy ABL<\/strong><\/a><strong> has been appointed <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/mws-renewables\/\" type=\"link\" id=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/mws-renewables\/\">marine warranty surveyor (MWS)<\/a> to support the transportation and installation of the <a href=\"https:\/\/www.offshorewind.biz\/2026\/04\/15\/abl-secures-work-on-new-south-korean-offshore-wind-farm\/\" type=\"link\" id=\"https:\/\/www.offshorewind.biz\/2026\/04\/15\/abl-secures-work-on-new-south-korean-offshore-wind-farm\/\">Shinan-Ui offshore wind farm<\/a> \u2013 a 390 MW wind project.<\/strong><\/p>\n\n\n\n<p>The project is developed by <a href=\"https:\/\/www.tgs4c.com\/windfarms\/south-korea\/sinan-ui---hanwha-e26c-south-korea-kr32.html\">Shinan-Ui Offshore Wind<\/a>, a consortium consisting of Hanwha Ocean, SK Eternix, KOMIPO (Korea Midland Power Co., Ltd.), Future Energy Fund, and Hyundai Engineering &amp; Construction.<\/p>\n\n\n\n<p>The Shinan-Ui offshore wind farm aims to triple South Korea\u2019s renewable energy generation by 2030, and will include both wind and solar PV capacity. It will include 26 wind turbines, installed near the south of the Ui-do island, on bottom-fixed foundations. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-abl-south-korea-s-scope-of-work\">ABL South Korea&#8217;s Scope of Work <\/h2>\n\n\n\n<p><a href=\"https:\/\/abl-group.com\/offices\/seoul\/\">ABL\u2019s operation in South Korea<\/a> will provide <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/mws-renewables\/\">marine warranty survey (MWS) services<\/a> to support the transportation and installation operations, as well as <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-surveys-inspections-and-audits\/vessel-and-marine-assurance\/\">marine assurance services<\/a> for the proposed marine spread for the project. <\/p>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\" style=\"grid-template-columns:15% auto\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"472\" height=\"630\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Junyoung-Kim_Black.jpg\" alt=\"\" class=\"wp-image-126336 size-full\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Junyoung-Kim_Black.jpg 472w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Junyoung-Kim_Black-225x300.jpg 225w\" sizes=\"auto, (max-width: 472px) 100vw, 472px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p>&#8220;This will be a breakout offshore wind development for South Korea&#8217;s energy landscape. Our in-country team will bring both a local and global MWS track record for offshore wind farm installations, to help our client ensure the safe, efficient and timely delivery of this project.&#8221;<\/p>\n\n\n\n<p><strong>Junyoung Kim, ABL&#8217;s Country Manager in South Korea<\/strong><\/p>\n<\/div><\/div>\n\n\n\n<p>ABL\u2019s scope of work includes technical document review and approval of procedures, technical documents and drawings for the entire offshore package, suitability surveys of the proposed fleet and on-site attendance to review and approve all warranted marine operations. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-abl-in-south-korea-a-legacy-in-offshore-wind\">ABL in South Korea: A legacy in offshore wind <\/h2>\n\n\n\n<p>Part of global consultancy <a href=\"https:\/\/abl-group.com\/\">ABL Group<\/a>, ABL has supported on more than 330 offshore wind projects worldwide in a variety of technical roles, alongside sister companies <a href=\"https:\/\/owcltd.com\/\">OWC \u2013 the renewable energy consultants<\/a>, and <a href=\"https:\/\/longitude-engineering.com\/\">Longitude \u2013 the design and engineering branch of ABL Group<\/a>. <\/p>\n\n\n\n<p>Together, the group has supported on more than 8 GW of offshore wind potential capacity in South Korea, including technical due diligence and advisory, marine operations and jack-up engineering services, and MWS for subsea cabling operations.<\/p>\n\n\n\n<p><br>ABL is part of Oslo-listed global consultancy group ABL Group ASA. <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-de-risking-south-korea-s-offshore-wind-construction\">De-Risking South Korea&#8217;s Offshore Wind Construction<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/03\/Kim-1024x576.jpg\" alt=\"\" class=\"wp-image-11247\" style=\"width:345px;height:auto\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/03\/Kim-1024x576.jpg 1024w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/03\/Kim-300x169.jpg 300w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/03\/Kim-768x432.jpg 768w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/03\/Kim-1536x864.jpg 1536w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/03\/Kim-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p><em>ABL South Korea provides a wide range of technical and consultancy services, with a proven track record of supporting the country&#8217;s offshore wind development. <\/em><\/p>\n\n\n\n<p><em>Alongside sister companies <a href=\"https:\/\/owcltd.com\/\" type=\"link\" id=\"https:\/\/owcltd.com\/\">OWC<\/a> and <a href=\"https:\/\/longitude-engineering.com\/\" type=\"link\" id=\"https:\/\/longitude-engineering.com\/\">Longitude<\/a>, it provides a complete technical offering to help you de-risk offshore wind transportation and installation (T&amp;I) operations. <\/em><\/p>\n\n\n\n<p><em>From geotechnical services, seismic analysis and jack-up engineering, to subsea cables engineering, ports advisory, marine assurance, DP and marine warranty survey &#8211; contact our team to discuss your project and the solutions to support you. <\/em><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-teal-background-color has-background wp-element-button\" href=\"https:\/\/abl-group.com\/offices\/seoul\/\">Contact ABL South Korea<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ABL appointed MWS to support South Korea&#8217;s 390 MW Shinan-Ui offshore wind farm  construction.<\/p>\n","protected":false},"author":7,"featured_media":123382,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[156,182,43,1115,1247,1204,64],"sector":[106],"service":[709,782],"company":[724],"class_list":["post-126335","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-marine-warranty-survey","tag-mws","tag-offshore-wind","tag-offshore-wind-construction","tag-shinan-ui","tag-south-korea","tag-ti","sector-renewables","service-marine-warranty-survey","service-mws-renewables","company-abl"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABL appointed to 390 MW South Korean offshore wind project - ABL<\/title>\n<meta name=\"description\" content=\"ABL has been appointed marine warranty surveyor to support South Korea&#039;s Shinan-Ui offshore wind farm construction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABL appointed to 390 MW South Korean offshore wind project\" \/>\n<meta property=\"og:description\" content=\"ABL has been appointed marine warranty surveyor to support South Korea&#039;s Shinan-Ui offshore wind farm construction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-15T07:48:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-15T14:00:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/01\/AdobeStock_515871685.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1240\" \/>\n\t<meta property=\"og:image:height\" content=\"827\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Tunkina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@george.lenox@aqualisbraemar.com\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Tunkina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/\"},\"author\":{\"name\":\"Katie Tunkina\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\"},\"headline\":\"ABL appointed to 390 MW South Korean offshore wind project\",\"datePublished\":\"2026-04-15T07:48:42+00:00\",\"dateModified\":\"2026-04-15T14:00:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/\"},\"wordCount\":433,\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/AdobeStock_515871685.jpeg\",\"keywords\":[\"Marine Warranty Survey\",\"MWS\",\"offshore wind\",\"Offshore Wind Construction\",\"Shinan Ui\",\"South Korea\",\"T&amp;I\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/\",\"name\":\"ABL appointed to 390 MW South Korean offshore wind project - ABL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/AdobeStock_515871685.jpeg\",\"datePublished\":\"2026-04-15T07:48:42+00:00\",\"dateModified\":\"2026-04-15T14:00:28+00:00\",\"description\":\"ABL has been appointed marine warranty surveyor to support South Korea's Shinan-Ui offshore wind farm construction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/AdobeStock_515871685.jpeg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/AdobeStock_515871685.jpeg\",\"width\":1240,\"height\":827,\"caption\":\"A large offshore vessel with a crane and a helipad is moored in the seaport of Rotterdam. A Jack-up vessel for use in the offshore wind industry\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABL appointed to 390 MW South Korean offshore wind project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\",\"name\":\"Katie Tunkina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"caption\":\"Katie Tunkina\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/george.lenox@aqualisbraemar.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABL appointed to 390 MW South Korean offshore wind project - ABL","description":"ABL has been appointed marine warranty surveyor to support South Korea's Shinan-Ui offshore wind farm construction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/","og_locale":"en_GB","og_type":"article","og_title":"ABL appointed to 390 MW South Korean offshore wind project","og_description":"ABL has been appointed marine warranty surveyor to support South Korea's Shinan-Ui offshore wind farm construction.","og_url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/","og_site_name":"ABL","article_published_time":"2026-04-15T07:48:42+00:00","article_modified_time":"2026-04-15T14:00:28+00:00","og_image":[{"width":1240,"height":827,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/01\/AdobeStock_515871685.jpeg","type":"image\/jpeg"}],"author":"Katie Tunkina","twitter_card":"summary_large_image","twitter_creator":"@george.lenox@aqualisbraemar.com","twitter_misc":{"Written by":"Katie Tunkina","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/#article","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/"},"author":{"name":"Katie Tunkina","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd"},"headline":"ABL appointed to 390 MW South Korean offshore wind project","datePublished":"2026-04-15T07:48:42+00:00","dateModified":"2026-04-15T14:00:28+00:00","mainEntityOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/"},"wordCount":433,"publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/01\/AdobeStock_515871685.jpeg","keywords":["Marine Warranty Survey","MWS","offshore wind","Offshore Wind Construction","Shinan Ui","South Korea","T&amp;I"],"articleSection":["News"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/","url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/","name":"ABL appointed to 390 MW South Korean offshore wind project - ABL","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/01\/AdobeStock_515871685.jpeg","datePublished":"2026-04-15T07:48:42+00:00","dateModified":"2026-04-15T14:00:28+00:00","description":"ABL has been appointed marine warranty surveyor to support South Korea's Shinan-Ui offshore wind farm construction.","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/01\/AdobeStock_515871685.jpeg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/01\/AdobeStock_515871685.jpeg","width":1240,"height":827,"caption":"A large offshore vessel with a crane and a helipad is moored in the seaport of Rotterdam. A Jack-up vessel for use in the offshore wind industry"},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-to-390-mw-south-korean-offshore-wind-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"ABL appointed to 390 MW South Korean offshore wind project"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd","name":"Katie Tunkina","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","caption":"Katie Tunkina"},"sameAs":["https:\/\/x.com\/george.lenox@aqualisbraemar.com"]}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/126335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/comments?post=126335"}],"version-history":[{"count":8,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/126335\/revisions"}],"predecessor-version":[{"id":126348,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/126335\/revisions\/126348"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/123382"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=126335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/categories?post=126335"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/tags?post=126335"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=126335"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=126335"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=126335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}