{"id":124738,"date":"2025-07-15T12:48:32","date_gmt":"2025-07-15T11:48:32","guid":{"rendered":"https:\/\/abl-group.com\/abl\/?p=124738"},"modified":"2025-07-15T12:48:35","modified_gmt":"2025-07-15T11:48:35","slug":"abl-chosen-for-installation-of-australian-interconnector","status":"publish","type":"post","link":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/","title":{"rendered":"ABL chosen for installation of Australian interconnector"},"content":{"rendered":"\n<p><a href=\"https:\/\/abl-group.com\/abl\/\"><strong>Energy and marine consultancy ABL<\/strong><\/a><strong> has been appointed as <\/strong><a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/mws-renewables\/\"><strong>marine warranty survey (MWS)<\/strong><\/a><strong> to support the installation of <a href=\"https:\/\/www.marinuslink.com.au\/\">Australia\u2019s Marinus Link interconnector<\/a> \u2013 a critical energy infrastructure project in facilitating Australia\u2019s energy transition.<\/strong><\/p>\n\n\n\n<p>Under the contract, ABL\u2019s operations in Australia will provide marine warranty survey services to support the marine transportation and installation (T&amp;I) campaign for the submarine part of the interconnector.<\/p>\n\n\n\n<p>The Marinus Link project will construct a 345-kilometre-long interconnector between Tasmania and Victoria, with 255 kilometres running undersea across Australia\u2019s Bass Strait. The asset is recognised by the Australian Energy Market Operator as essential in supporting the transition of the country\u2019s energy mix from coal-fired power, enhancing renewable energy integration and storage in the wider Australian grid network, and enabling the efficient flow of energy between Tasmania and Victoria.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/08\/Jason-Hannath.jpg\" alt=\"Jason Hannath\" class=\"wp-image-121441\" style=\"width:146px;height:auto\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/08\/Jason-Hannath.jpg 800w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/08\/Jason-Hannath-300x300.jpg 300w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/08\/Jason-Hannath-150x150.jpg 150w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/08\/Jason-Hannath-768x768.jpg 768w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/08\/Jason-Hannath-600x600.jpg 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>\n\n\n<p>&#8220;Marinus Link is a major development project in Australia&#8217;s energy strategy. It will facilitate the interconnection of enough power to support the equivalent of 1.5 million homes, including providing wider access to renewable energy as more of it comes online. We are pleased to bring ABL&#8217;s global track record in supporting the safe delivery of interconnection projects, combined with our local market knowledge, to support this vital initiative.&#8221; <\/p>\n\n\n\n<p><a href=\"https:\/\/abl-group.com\/abl\/people\/jason-hannath\/\">Jason Hannath<\/a>, ABL&#8217;s Country Manager in Australia <\/p>\n<\/blockquote>\n\n\n\n<p>Under its scope of work, ABL will support Stage 1 of the Marinus Link development, including transportation operations, trenching, cable lay and cable burial operations, landfall and pull-in operations. Services will include the technical review of project documentation, drawings and calculations, <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-surveys-inspections-and-audits\/\">vessel suitability surveys and assurance<\/a> for the proposed specialised fleet, <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-surveys-inspections-and-audits\/dynamic-positioning-dp-critical-systems\/\">DP assurance<\/a> where relevant, and on-site attendance to witness and approve warranted operations.<\/p>\n\n\n\n<p>ABL \u2013 part of Oslo-listed global consultancy <a href=\"https:\/\/abl-group.com\/\">ABL Group<\/a> \u2013 has been operational in Australia since 1988. With ABL\u2019s local headquarters in Perth, the group also has offices in Brisbane, Sydney and Melbourne via its sister company, <a href=\"https:\/\/owcltd.com\/\">renewable energy consultancy OWC<\/a>.<\/p>\n\n\n\n<p>Globally, ABL has supported as MWS on transportation and installation of more than 45 interconnectors.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-discover-more-on-abl-s-work-in-electrification\">Discover more on ABL&#8217;s work in Electrification<\/h2>\n\n\n\n<p><em>ABL, together with the wider ABL Group, delivers comprehensive, end-to-end technical solutions to support grid interconnection and infrastructure development\u2014from early-stage concept and feasibility studies through to construction, commissioning, and operational support.<\/em><\/p>\n\n\n\n<p><em>Whether it&#8217;s enabling offshore wind integration, supporting subsea interconnectors, or advancing grid resilience, our teams &#8211; including specialists at ABL Australia &#8211; are at the forefront of delivering innovative, reliable, and sustainable energy solutions across the globe.<\/em><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-teal-background-color has-background wp-element-button\" href=\"https:\/\/abl-group.com\/abl\/electrification-2\/\">Electrification with ABL <\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-teal-background-color has-background wp-element-button\" href=\"https:\/\/abl-group.com\/offices\/perth\/\">ABL Australia<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ABL Australia appointed marine warranty surveyor (MWS) to support the installation of Australia&#8217;s Marinus Link Interconnector. <\/p>\n","protected":false},"author":7,"featured_media":120464,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[1043,1098,1021,1102,1101,266,156,1059,182,43],"sector":[900],"service":[765,709,782],"company":[724],"class_list":["post-124738","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-abl-australia","tag-abl-perth","tag-electrification","tag-energy-transition-consulting","tag-grid-interconnection","tag-interconnector","tag-marine-warranty-survey","tag-marine-warranty-surveyor","tag-mws","tag-offshore-wind","sector-energy-transition","service-loss-prevention","service-marine-warranty-survey","service-mws-renewables","company-abl"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABL chosen for installation of Australian interconnector - ABL<\/title>\n<meta name=\"description\" content=\"ABL Australia appointed as marine warranty surveyor (MWS) to support the installation of Australia&#039;s Marinus Link Interconnector.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABL chosen for installation of Australian interconnector\" \/>\n<meta property=\"og:description\" content=\"ABL Australia appointed as marine warranty surveyor (MWS) to support the installation of Australia&#039;s Marinus Link Interconnector.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-15T11:48:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-15T11:48:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/07\/Interconnector-cable.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1439\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Tunkina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@george.lenox@aqualisbraemar.com\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Tunkina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/\"},\"author\":{\"name\":\"Katie Tunkina\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\"},\"headline\":\"ABL chosen for installation of Australian interconnector\",\"datePublished\":\"2025-07-15T11:48:32+00:00\",\"dateModified\":\"2025-07-15T11:48:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/\"},\"wordCount\":419,\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Interconnector-cable.jpg\",\"keywords\":[\"ABL Australia\",\"ABL Perth\",\"Electrification\",\"Energy Transition Consulting\",\"Grid Interconnection\",\"interconnector\",\"Marine Warranty Survey\",\"Marine Warranty Surveyor\",\"MWS\",\"offshore wind\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/\",\"name\":\"ABL chosen for installation of Australian interconnector - ABL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Interconnector-cable.jpg\",\"datePublished\":\"2025-07-15T11:48:32+00:00\",\"dateModified\":\"2025-07-15T11:48:35+00:00\",\"description\":\"ABL Australia appointed as marine warranty surveyor (MWS) to support the installation of Australia's Marinus Link Interconnector.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Interconnector-cable.jpg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/Interconnector-cable.jpg\",\"width\":2560,\"height\":1439},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-chosen-for-installation-of-australian-interconnector\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABL chosen for installation of Australian interconnector\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\",\"name\":\"Katie Tunkina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"caption\":\"Katie Tunkina\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/george.lenox@aqualisbraemar.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABL chosen for installation of Australian interconnector - ABL","description":"ABL Australia appointed as marine warranty surveyor (MWS) to support the installation of Australia's Marinus Link Interconnector.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/","og_locale":"en_GB","og_type":"article","og_title":"ABL chosen for installation of Australian interconnector","og_description":"ABL Australia appointed as marine warranty surveyor (MWS) to support the installation of Australia's Marinus Link Interconnector.","og_url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/","og_site_name":"ABL","article_published_time":"2025-07-15T11:48:32+00:00","article_modified_time":"2025-07-15T11:48:35+00:00","og_image":[{"width":2560,"height":1439,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/07\/Interconnector-cable.jpg","type":"image\/jpeg"}],"author":"Katie Tunkina","twitter_card":"summary_large_image","twitter_creator":"@george.lenox@aqualisbraemar.com","twitter_misc":{"Written by":"Katie Tunkina","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/#article","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/"},"author":{"name":"Katie Tunkina","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd"},"headline":"ABL chosen for installation of Australian interconnector","datePublished":"2025-07-15T11:48:32+00:00","dateModified":"2025-07-15T11:48:35+00:00","mainEntityOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/"},"wordCount":419,"publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/07\/Interconnector-cable.jpg","keywords":["ABL Australia","ABL Perth","Electrification","Energy Transition Consulting","Grid Interconnection","interconnector","Marine Warranty Survey","Marine Warranty Surveyor","MWS","offshore wind"],"articleSection":["News"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/","url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/","name":"ABL chosen for installation of Australian interconnector - ABL","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/07\/Interconnector-cable.jpg","datePublished":"2025-07-15T11:48:32+00:00","dateModified":"2025-07-15T11:48:35+00:00","description":"ABL Australia appointed as marine warranty surveyor (MWS) to support the installation of Australia's Marinus Link Interconnector.","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/07\/Interconnector-cable.jpg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2024\/07\/Interconnector-cable.jpg","width":2560,"height":1439},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-chosen-for-installation-of-australian-interconnector\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"ABL chosen for installation of Australian interconnector"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd","name":"Katie Tunkina","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","caption":"Katie Tunkina"},"sameAs":["https:\/\/x.com\/george.lenox@aqualisbraemar.com"]}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/comments?post=124738"}],"version-history":[{"count":1,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124738\/revisions"}],"predecessor-version":[{"id":124740,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124738\/revisions\/124740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/120464"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=124738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/categories?post=124738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/tags?post=124738"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=124738"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=124738"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=124738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}