{"id":124434,"date":"2025-06-10T09:30:22","date_gmt":"2025-06-10T08:30:22","guid":{"rendered":"https:\/\/abl-group.com\/abl\/?p=124434"},"modified":"2025-06-10T09:30:27","modified_gmt":"2025-06-10T08:30:27","slug":"abl-appointed-mws-on-indonesias-tangguh-ucc-project","status":"publish","type":"post","link":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/","title":{"rendered":"ABL appointed MWS on Indonesia&#8217;s Tangguh UCC Project"},"content":{"rendered":"\n<p><a href=\"https:\/\/abl-group.com\/abl\/\"><strong>Energy and marine consultancy ABL<\/strong><\/a><strong>, a subsidiary of <\/strong><a href=\"https:\/\/abl-group.com\/\"><strong>ABL Group ASA<\/strong><\/a><strong>, has been awarded a contract to provide <\/strong><a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/\"><strong>marine warranty survey (MWS)<\/strong><\/a><strong> services to bp\u2019s <a href=\"https:\/\/www.bp.com\/en_id\/indonesia\/home\/who-we-are\/tangguh-lng\/enhanced-gas-recovery-carbon-capture-utilization-and-storage.html\">Tangguh UCC project<\/a> in Indonesia.<\/strong><\/p>\n\n\n\n<p>The Tangguh UCC Project comprises Ubadari field development, enhanced gas recovery through carbon capture, utilization and storage (EGR\/CCUS) and onshore compression, operated by bp in Papua Barat Province, Indonesia.<\/p>\n\n\n\n<p>Tangguh\u2019s EGR\/CCUS, part of the UCC Project, aims to be the first <a href=\"https:\/\/abl-group.com\/abl\/carbon-capture-utilisation-and-storage-ccus\/\">CCUS<\/a> project developed at scale in Indonesia, with potential for sequestering around 15 million tonnes of CO2 from Tangguh\u2019s emissions in its initial phase.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.jgc-indonesia.com\/en\/\">P.T. JGC Indonesia <\/a>has been contracted by bp as the Onshore Engineering, Procurement, Construction and Installation (EPCI) Contract for the Tangguh UCC Project in Indonesia and will be responsible for installation of the onshore compression facilities at the Tangguh LNG Plant.<\/p>\n\n\n\n<p>New units at the onshore LNG facility mainly consist of Hydrocarbon Compressors (2,350 MMSCFD) to boost natural gas pressure from the existing gas wells, EGR Compressors (270 MMSCFD) to collect and compress acid gas from the existing acid gas removal unit, and a newly-built combined cycle power plant as well as associated utilities.<\/p>\n\n\n\n<p>P.T. JGC Indonesia has contracted ABL to support their scope through the provision of Marine Warranty Survey Services. ABL\u2019s operations in Indonesia have been awarded the contract and will manage the project\u2019s scope of work, which includes the technical review of project documentation, drawings and calculations relating to the transportation of the warranted cargoes, and <a href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-surveys-inspections-and-audits\/dynamic-positioning-dp-critical-systems\/\">suitability surveys of the proposed transportation fleet<\/a> for these cargos.<\/p>\n\n\n\n<p>ABL will also provide on-site attendances to witness and approve the RoRo (roll-on, roll-off) and LoLo (lift on, lift off), loadout, transportation and discharge of modules from Indonesian fabrications facilities along with associated long-lead\/ high value, cargo shipments from various Asian and European ports to the Tangguh site in Papua Barat Province, Indonesia.<\/p>\n\n\n\n<p>It will resource the in-country site attendances locally out of its Jakarta and Batam offices. Further, it will draw upon the support of ABL\u2019s wider global footprint to provide site attendance and vessel surveys in the required international project locations. \u00a0<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/04\/Reuben-Segal-1.jpg\" alt=\"Reuben Segal\" class=\"wp-image-117540\" style=\"width:172px;height:auto\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/04\/Reuben-Segal-1.jpg 800w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/04\/Reuben-Segal-1-300x300.jpg 300w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/04\/Reuben-Segal-1-150x150.jpg 150w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/04\/Reuben-Segal-1-768x768.jpg 768w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2021\/04\/Reuben-Segal-1-600x600.jpg 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;This project combines both ABL&#8217;s market-leading reputation in marine warranty survey and the wider ABL Group&#8217;s proven expertise in key <a href=\"https:\/\/abl-group.com\/energy-transition\/\">energy transition technologies<\/a>, including in <a href=\"https:\/\/abl-group.com\/abl\/carbon-capture-utilisation-and-storage-ccus\/\">CCUS<\/a> and geothermal. We are delighted to be appointed to support JGC &#8211; and BP &#8211; in this important initiative to help Indonesia meet its growing energy demand. It is a testament to both our historic legacy in Indonesian marine and energy sectors, with a long-term track record in-country, as well as to our recognised status worldwide to support clients in complex large-scale projects of this type.&#8221;<\/p>\n\n\n\n<p>Reuben Segal, CEO of ABL Group ASA<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<\/blockquote>\n\n\n\n<p><em>Discover more on ABL&#8217;s global offering in marine warranty survey (MWS), or contact ABL&#8217;s operations in Indonesia, to discuss our support for your project&#8217;s success: <\/em><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-teal-background-color has-background wp-element-button\" href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/\">Marine warranty survey<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-teal-background-color has-background wp-element-button\" href=\"https:\/\/abl-group.com\/our-locations\/apac\/\">ABL Indonesia<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ABL wins contract to provide MWS to bp&#8217;s Tangguh UCC project in Indonesia. <\/p>\n","protected":false},"author":7,"featured_media":124435,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[824,1082,987,156,182,20],"sector":[900,107,843],"service":[765,718,709,785],"company":[724],"class_list":["post-124434","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-abl","tag-abl-indonesia","tag-ccus","tag-marine-warranty-survey","tag-mws","tag-oil-and-gas","sector-energy-transition","sector-oil-gas","sector-onshore","service-loss-prevention","service-surveys-inspections-audits","service-marine-warranty-survey","service-mws-project-cargo","company-abl"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABL appointed MWS on Indonesia&#039;s Tangguh UCC Project - ABL<\/title>\n<meta name=\"description\" content=\"ABL Indonesia has been awarded a new contract to provide marine warranty survey (MWS) on bp&#039;s Tangguh UCC project, Indonesia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABL appointed MWS on Indonesia&#039;s Tangguh UCC Project\" \/>\n<meta property=\"og:description\" content=\"ABL Indonesia has been awarded a new contract to provide marine warranty survey (MWS) on bp&#039;s Tangguh UCC project, Indonesia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-10T08:30:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-10T08:30:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/06\/AdobeStock_201345274-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1438\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Tunkina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@george.lenox@aqualisbraemar.com\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Tunkina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/\"},\"author\":{\"name\":\"Katie Tunkina\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\"},\"headline\":\"ABL appointed MWS on Indonesia&#8217;s Tangguh UCC Project\",\"datePublished\":\"2025-06-10T08:30:22+00:00\",\"dateModified\":\"2025-06-10T08:30:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/\"},\"wordCount\":497,\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/AdobeStock_201345274-scaled.jpeg\",\"keywords\":[\"ABL\",\"ABL Indonesia\",\"CCUS\",\"Marine Warranty Survey\",\"MWS\",\"oil and gas\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/\",\"name\":\"ABL appointed MWS on Indonesia's Tangguh UCC Project - ABL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/AdobeStock_201345274-scaled.jpeg\",\"datePublished\":\"2025-06-10T08:30:22+00:00\",\"dateModified\":\"2025-06-10T08:30:27+00:00\",\"description\":\"ABL Indonesia has been awarded a new contract to provide marine warranty survey (MWS) on bp's Tangguh UCC project, Indonesia.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/AdobeStock_201345274-scaled.jpeg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/AdobeStock_201345274-scaled.jpeg\",\"width\":2560,\"height\":1438,\"caption\":\"Aerial top view oil and gas refinery factory and Petrochemical plant at night.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABL appointed MWS on Indonesia&#8217;s Tangguh UCC Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\",\"name\":\"Katie Tunkina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"caption\":\"Katie Tunkina\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/george.lenox@aqualisbraemar.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABL appointed MWS on Indonesia's Tangguh UCC Project - ABL","description":"ABL Indonesia has been awarded a new contract to provide marine warranty survey (MWS) on bp's Tangguh UCC project, Indonesia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/","og_locale":"en_GB","og_type":"article","og_title":"ABL appointed MWS on Indonesia's Tangguh UCC Project","og_description":"ABL Indonesia has been awarded a new contract to provide marine warranty survey (MWS) on bp's Tangguh UCC project, Indonesia.","og_url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/","og_site_name":"ABL","article_published_time":"2025-06-10T08:30:22+00:00","article_modified_time":"2025-06-10T08:30:27+00:00","og_image":[{"width":2560,"height":1438,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/06\/AdobeStock_201345274-scaled.jpeg","type":"image\/jpeg"}],"author":"Katie Tunkina","twitter_card":"summary_large_image","twitter_creator":"@george.lenox@aqualisbraemar.com","twitter_misc":{"Written by":"Katie Tunkina","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/#article","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/"},"author":{"name":"Katie Tunkina","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd"},"headline":"ABL appointed MWS on Indonesia&#8217;s Tangguh UCC Project","datePublished":"2025-06-10T08:30:22+00:00","dateModified":"2025-06-10T08:30:27+00:00","mainEntityOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/"},"wordCount":497,"publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/06\/AdobeStock_201345274-scaled.jpeg","keywords":["ABL","ABL Indonesia","CCUS","Marine Warranty Survey","MWS","oil and gas"],"articleSection":["News"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/","url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/","name":"ABL appointed MWS on Indonesia's Tangguh UCC Project - ABL","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/06\/AdobeStock_201345274-scaled.jpeg","datePublished":"2025-06-10T08:30:22+00:00","dateModified":"2025-06-10T08:30:27+00:00","description":"ABL Indonesia has been awarded a new contract to provide marine warranty survey (MWS) on bp's Tangguh UCC project, Indonesia.","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/06\/AdobeStock_201345274-scaled.jpeg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/06\/AdobeStock_201345274-scaled.jpeg","width":2560,"height":1438,"caption":"Aerial top view oil and gas refinery factory and Petrochemical plant at night."},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-appointed-mws-on-indonesias-tangguh-ucc-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"ABL appointed MWS on Indonesia&#8217;s Tangguh UCC Project"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd","name":"Katie Tunkina","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","caption":"Katie Tunkina"},"sameAs":["https:\/\/x.com\/george.lenox@aqualisbraemar.com"]}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124434","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/comments?post=124434"}],"version-history":[{"count":1,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124434\/revisions"}],"predecessor-version":[{"id":124436,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124434\/revisions\/124436"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/124435"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=124434"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/categories?post=124434"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/tags?post=124434"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=124434"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=124434"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=124434"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}