{"id":124049,"date":"2025-04-02T11:50:35","date_gmt":"2025-04-02T10:50:35","guid":{"rendered":"https:\/\/abl-group.com\/abl\/?p=124049"},"modified":"2025-04-02T14:20:27","modified_gmt":"2025-04-02T13:20:27","slug":"abl-completes-marquee-installation-lift-at-ichthys","status":"publish","type":"post","link":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/","title":{"rendered":"ABL completes marquee installation lift at Ichthys"},"content":{"rendered":"\n<p><a href=\"https:\/\/abl-group.com\/abl\/\"><strong>Energy and marine consultancy ABL<\/strong><\/a><strong> has supported INPEX with the successful lift installation of a Booster Compression Module (BCM) onto the operator\u2019s central processing facility (CPF), <em>Ichthys Explorer<\/em> \u2013 part of <a href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/loc-australia-building-on-strong-momentum-gained-in-the-oil-gas-market-with-ichthys-lng-contract-award\/\">Australia\u2019s Ichthys LNG<\/a>.<\/strong><\/p>\n\n\n\n<p>The landmark project involved the loadout, near shore transfer lift, marine transportation from Asia to Australia and the offshore installation of the 4,500 tonnes compression module onto the CPF.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/TVDL4426-768x1024.jpg\" alt=\"\" class=\"wp-image-124051\" style=\"aspect-ratio:1;width:255px;height:auto\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/TVDL4426-768x1024.jpg 768w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/TVDL4426-225x300.jpg 225w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/TVDL4426-1152x1536.jpg 1152w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/TVDL4426.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">abl gROUP eNERGY mANAGING dIRECTOR, aLEX hARRISON, ATTENDING ON-SITE.<\/figcaption><\/figure>\n<\/div>\n\n\n<p>The lift was conducted with the <em>Sleipnir<\/em>, a semi-submersible crane vessel (SSCV), operated by Heerema Marine Contractors, utilising one of her two massive 10,000 tonne capacity cranes.<\/p>\n\n\n\n<p>The installation lift is one of, if not the, heaviest lift ever performed onto an already operating floating production unit.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;ABL has supported INPEX with its various development phases of the Ichthys Field for close to 15 years, and we were delighted to be asked to support them during this latest essential and complex development stage too. The installation of the BCM will help maintain the CPF&#8217;s production rates throughout its 40-year design life.&#8221; <\/p>\n\n\n\n<p>Alex Harrison, ABL Group Managing Director for Energy<\/p>\n<\/blockquote>\n\n\n\n<p>Due to the floating nature of the receiving platform, the project involved considerable work in the assessment of the pre-ballasted and post-installation inclinations of the CPF, and the effects of mooring stiffness on these inclinations. The project also involved significant work in the assessment of multi-body relative motions for the installation vessel and the CPF. These were to determine the installation loads, resulting limiting installation sea states, the design of the lift rigging which included some of the largest man-made fibre slings ever fabricated, and the design and installation of a novel bumper and guiding system.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;This has been one of the most interesting technical projects I have ever been involved with, and it was an honour to personally be the attending surveyor for the nearshore transfer, transportation and offshore lift operations. It will certainly go down as a true highlight of my 30 years in the industry.&#8221; <\/p>\n\n\n\n<p>Adds Alex Harrison<\/p>\n<\/blockquote>\n\n\n\n<p>ABL is the energy and marine consultancy branch of Oslo-listed global consultancy <a href=\"https:\/\/abl-group.com\/\">ABL Group ASA<\/a>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><em>Learn more about ABL&#8217;s global offering in marine warranty survey, supporting more than 900 projects in 2024 alone<\/em>. <\/p>\n\n\n\n<p><em>Our market-leading offering supports projects from transportation and installation (T&amp;I), operations and maintenance (O&amp;M), marine transportation for project cargo, to life extension and decommissioning: <\/em><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-teal-background-color has-background wp-element-button\" href=\"https:\/\/abl-group.com\/abl\/loss-prevention\/marine-warranty-survey\/\">Marine Warranty Survey<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ABL supports INPEX with the successful lift installation of a Booster Compression Module (BCM) onto the operator&#8217;s central processing facility (CPF), Ichthys Explorer. <\/p>\n","protected":false},"author":7,"featured_media":124052,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[1043,323,63,156,1059,182,120,64,1057],"sector":[842,107],"service":[765,709,783],"company":[724],"class_list":["post-124049","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-abl-australia","tag-ichthys-lng","tag-lng","tag-marine-warranty-survey","tag-marine-warranty-surveyor","tag-mws","tag-oil-gas","tag-ti","tag-transportation-and-installation","sector-midstream","sector-oil-gas","service-loss-prevention","service-marine-warranty-survey","service-mws-oil-gas","company-abl"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABL completes marquee installation lift at Ichthys - ABL<\/title>\n<meta name=\"description\" content=\"ABL supports INPEX with the successful lift installation of a Booster Compression Module (BCM), part of Australia&#039;s Ichthys LNG project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABL completes marquee installation lift at Ichthys\" \/>\n<meta property=\"og:description\" content=\"ABL supports INPEX with the successful lift installation of a Booster Compression Module (BCM), part of Australia&#039;s Ichthys LNG project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-02T10:50:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-02T13:20:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/Ichthys_Final.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1921\" \/>\n\t<meta property=\"og:image:height\" content=\"905\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Tunkina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@george.lenox@aqualisbraemar.com\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Tunkina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/\"},\"author\":{\"name\":\"Katie Tunkina\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\"},\"headline\":\"ABL completes marquee installation lift at Ichthys\",\"datePublished\":\"2025-04-02T10:50:35+00:00\",\"dateModified\":\"2025-04-02T13:20:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/\"},\"wordCount\":400,\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Ichthys_Final.jpg\",\"keywords\":[\"ABL Australia\",\"Ichthys LNG\",\"LNG\",\"Marine Warranty Survey\",\"Marine Warranty Surveyor\",\"MWS\",\"Oil &amp; Gas\",\"T&amp;I\",\"Transportation and installation\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/\",\"name\":\"ABL completes marquee installation lift at Ichthys - ABL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Ichthys_Final.jpg\",\"datePublished\":\"2025-04-02T10:50:35+00:00\",\"dateModified\":\"2025-04-02T13:20:27+00:00\",\"description\":\"ABL supports INPEX with the successful lift installation of a Booster Compression Module (BCM), part of Australia's Ichthys LNG project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Ichthys_Final.jpg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Ichthys_Final.jpg\",\"width\":1921,\"height\":905},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/all-media\\\/news\\\/abl-completes-marquee-installation-lift-at-ichthys\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABL completes marquee installation lift at Ichthys\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/person\\\/564f5d10eb1fcb96a466fb0d06016dfd\",\"name\":\"Katie Tunkina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g\",\"caption\":\"Katie Tunkina\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/george.lenox@aqualisbraemar.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABL completes marquee installation lift at Ichthys - ABL","description":"ABL supports INPEX with the successful lift installation of a Booster Compression Module (BCM), part of Australia's Ichthys LNG project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/","og_locale":"en_GB","og_type":"article","og_title":"ABL completes marquee installation lift at Ichthys","og_description":"ABL supports INPEX with the successful lift installation of a Booster Compression Module (BCM), part of Australia's Ichthys LNG project.","og_url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/","og_site_name":"ABL","article_published_time":"2025-04-02T10:50:35+00:00","article_modified_time":"2025-04-02T13:20:27+00:00","og_image":[{"width":1921,"height":905,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/Ichthys_Final.jpg","type":"image\/jpeg"}],"author":"Katie Tunkina","twitter_card":"summary_large_image","twitter_creator":"@george.lenox@aqualisbraemar.com","twitter_misc":{"Written by":"Katie Tunkina","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/#article","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/"},"author":{"name":"Katie Tunkina","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd"},"headline":"ABL completes marquee installation lift at Ichthys","datePublished":"2025-04-02T10:50:35+00:00","dateModified":"2025-04-02T13:20:27+00:00","mainEntityOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/"},"wordCount":400,"publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/Ichthys_Final.jpg","keywords":["ABL Australia","Ichthys LNG","LNG","Marine Warranty Survey","Marine Warranty Surveyor","MWS","Oil &amp; Gas","T&amp;I","Transportation and installation"],"articleSection":["News"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/","url":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/","name":"ABL completes marquee installation lift at Ichthys - ABL","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/Ichthys_Final.jpg","datePublished":"2025-04-02T10:50:35+00:00","dateModified":"2025-04-02T13:20:27+00:00","description":"ABL supports INPEX with the successful lift installation of a Booster Compression Module (BCM), part of Australia's Ichthys LNG project.","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/Ichthys_Final.jpg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2025\/04\/Ichthys_Final.jpg","width":1921,"height":905},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/all-media\/news\/abl-completes-marquee-installation-lift-at-ichthys\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"ABL completes marquee installation lift at Ichthys"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/person\/564f5d10eb1fcb96a466fb0d06016dfd","name":"Katie Tunkina","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/840067e9152385875bc5c0388fdce6d58ad0c74c5feac45d2c5cdedf814205cc?s=96&d=mm&r=g","caption":"Katie Tunkina"},"sameAs":["https:\/\/x.com\/george.lenox@aqualisbraemar.com"]}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124049","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/comments?post=124049"}],"version-history":[{"count":3,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124049\/revisions"}],"predecessor-version":[{"id":124055,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/posts\/124049\/revisions\/124055"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/124052"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=124049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/categories?post=124049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/tags?post=124049"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=124049"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=124049"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=124049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}