{"id":126241,"date":"2026-04-02T16:02:04","date_gmt":"2026-04-02T15:02:04","guid":{"rendered":"https:\/\/abl-group.com\/abl\/?post_type=case-study&#038;p=126241"},"modified":"2026-04-02T16:34:16","modified_gmt":"2026-04-02T15:34:16","slug":"advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus","status":"publish","type":"case-study","link":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/","title":{"rendered":"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus"},"content":{"rendered":"\n<div class=\"wp-block-cover alignfull has-parallax\"><div class=\"wp-block-cover__image-background wp-image-126242 size-full has-parallax\" style=\"background-position:50% 50%;background-image:url(https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-3.png)\"><\/div><span aria-hidden=\"true\" class=\"wp-block-cover__background has-darkgrey-background-color has-background-dim-80 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Advanced hydrodynamic modelling by <a href=\"https:\/\/hidromod.com\/\">Hidromod<\/a>, prt of ABL, ensures the reliable and environmentally compliant operation of one of the world\u2019s first gigawatt-scale seawater-cooled data centre campuses.<\/strong><\/p>\n\n\n\n<p><strong>Location<\/strong>: Start Campus\u2019 SINES Data Centre &#8211; Sines, Portugal<\/p>\n\n\n\n<p><strong>Duration<\/strong>: Ongoing<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<h2 class=\"wp-block-heading\" id=\"h-project-introduction\">Project Introduction<\/h2>\n\n\n\n<p>Hidromod, part of ABL, provided advanced technical advisory support and specialist hydrodynamic modelling for the seawater cooling system of a data centre developed by <a href=\"https:\/\/www.startcampus.pt\/\" target=\"_blank\" rel=\"noreferrer noopener\">Start Campus<\/a> in Sines, Portugal.<\/p>\n\n\n\n<p>The work, led by the Hidromod team, based in Portugal, combined historical oceanographic data analysis, advanced numerical modelling, and environmental compliance studies to support the design, performance optimisation and long-term operability of the cooling system.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"601\" height=\"401\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg\" alt=\"\" class=\"wp-image-126235\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg 601w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1-300x200.jpg 300w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1-390x260.jpg 390w\" sizes=\"auto, (max-width: 601px) 100vw, 601px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-cover alignfull has-parallax\"><div class=\"wp-block-cover__image-background wp-image-126243 size-full has-parallax\" style=\"background-position:50% 50%;background-image:url(https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-2.png)\"><\/div><span aria-hidden=\"true\" class=\"wp-block-cover__background has-blue-background-color has-background-dim-70 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-constrained wp-block-cover-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<h2 class=\"wp-block-heading\" id=\"h-about-the-start-campus-data-centre-0\">About the Start Campus data centre<\/h2>\n\n\n\n<p>The <a href=\"https:\/\/www.startcampus.pt\/\" target=\"_blank\" rel=\"noreferrer noopener\">Start Campus data centre<\/a> uses a seawater cooling system as a core element of its sustainability and resource-efficiency strategy.<\/p>\n\n\n\n<p>By harnessing the cooling power of the Atlantic Ocean, the development aims to achieve a Water Usage Effectiveness (WUE) of zero, meaning no freshwater consumption for cooling, alongside an optimised design Power Usage Effectiveness (PUE) of approximately 1.1.<\/p>\n\n\n\n<p>The project has been publicly positioned as the world\u2019s first gigawatt-scale data campus cooled using a seawater cooling system. This makes the reliable operation and environmental compatibility of the cooling process a critical component of the overall data centre concept.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"483\" height=\"247\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-4.png\" alt=\"\" class=\"wp-image-126244\" srcset=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-4.png 483w, https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-4-300x153.png 300w\" sizes=\"auto, (max-width: 483px) 100vw, 483px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:61px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-hidromod-s-scope-of-work\">Hidromod\u2019s scope of work<\/h2>\n\n\n\n<p><strong>Hidromod supported the project through a combination of advanced data analysis, numerical modelling, and environmental assessment, including:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\" id=\"h-site-environmental-characterisation\">Site environmental characterisation: <\/h3>\n\n\n\n<p>Hidromod assessed the historical seawater temperature at the site, using in-situ measurements, satellite data, and numerical modelling, together with the definition of representative metocean scenarios to characterise operational conditions.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"284\" height=\"160\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-5.png\" alt=\"\" class=\"wp-image-126238\"\/><\/figure>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\" id=\"h-future-infrastructure-scenario-analysis\">Future infrastructure scenario analysis: <\/h3>\n\n\n\n<p>Potential future port development scenarios were evaluated and incorporated, based on detailed construction timelines supplied by the Port Authority (APS), to evaluate potential interference with cooling system efficiency.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"284\" height=\"160\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-6.png\" alt=\"\" class=\"wp-image-126237\"\/><\/figure>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\" id=\"h-hydrodynamic-and-thermal-plume-modelling\">Hydrodynamic and thermal plume modelling<strong>:<\/strong><\/h3>\n\n\n\n<p>A three-dimensional hydrodynamic modelling framework was developed and implemented to simulate the thermal plume generated by the cooling-water discharge under relevant metocean and boundary-condition scenarios.<\/p>\n\n\n\n<p>These simulations supported statistical analyses of water temperature at the intake basin, including the effects of cold-water discharge from a nearby LNG terminal, and enabled a quantitative assessment of the discharge compliance with environmental requirements for the Environmental Impact Assessment. In parallel, a monitoring strategy for seawater temperature was defined.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"286\" height=\"161\" src=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-7.png\" alt=\"\" class=\"wp-image-126236\"\/><\/figure>\n<\/div><\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-intake-basin-performance-analysis\">Intake basin performance analysis: <\/h3>\n\n\n\n<p>High-resolution modelling of the intake basin was carried out to evaluate mixing behaviour between the cooling discharge and the cold-water discharge from the nearby LNG terminal, and outfall providing insights into mixing efficiency and operational risks.<\/p>\n\n\n\n<div style=\"height:45px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-cover alignfull has-parallax\"><div class=\"wp-block-cover__image-background wp-image-126243 size-full has-parallax\" style=\"background-position:50% 50%;background-image:url(https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-2.png)\"><\/div><span aria-hidden=\"true\" class=\"wp-block-cover__background has-blue-background-color has-background-dim-70 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-constrained wp-block-cover-is-layout-constrained\">\n<h3 class=\"wp-block-heading has-text-align-left\" id=\"h-rather-than-a-single-study-0\"><strong>Rather than a single study<\/strong>&#8230;<\/h3>\n\n\n\n<p>Hidromod\u2019s work represents a multi-year, iterative modelling programme initiated in 2022, combining extensive historical oceanographic datasets with successive simulation phases to continuously refine and validate the performance and environmental compliance of the seawater cooling system.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-cover alignfull\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-darkgrey-background-color has-background-dim-100 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left has-large-font-size\" id=\"h-project-benefits\">Project benefits<\/h2>\n\n\n\n<div class=\"wp-block-columns are-vertically-aligned-top is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-outermost-icon-block items-justified-left\"><div class=\"icon-container has-icon-color has-teal-color\" style=\"color:#0AC49A;width:60px;transform:rotate(0deg) scaleX(1) scaleY(1)\"><svg id=\"Layer_2\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"200\" height=\"200\" viewBox=\"0 0 24 19.01\"><g id=\"Layer_1-2\"><path d=\"m7.25,15.21h-.01c-.16-.06-.34.02-.4.18-.06.16.02.34.18.4h.01c.16.06.34-.02.4-.18.06-.16-.02-.34-.18-.4Z\"><\/path><path d=\"m12.3,12.76c.16.05.34-.04.39-.2s-.04-.34-.2-.39h-.01c-.16-.06-.34.04-.39.2-.05.16.04.34.2.39h.01Z\"><\/path><path d=\"m21.14,15.19c-3.73-.19-6.24-1.09-7.71-2.18-.14-.1-.33-.07-.43.06s-.07.33.06.43h0c1.61,1.19,4.23,2.11,8.05,2.3.17,0,.32-.12.33-.29s-.12-.32-.29-.33Z\"><\/path><polygon points=\"11.26 9.47 11.26 9.47 11.26 9.47 11.26 9.47\"><\/polygon><path d=\"m15.66,18.39c-2.23-.05-3.87-.25-5.09-.6-1.22-.35-2.02-.83-2.62-1.47-.12-.13-.31-.13-.44-.01s-.13.31-.01.44c.69.73,1.61,1.28,2.91,1.65,1.3.37,2.99.57,5.25.62.17,0,.31-.13.32-.3,0-.17-.13-.31-.3-.32Z\"><\/path><path d=\"m23.7,14.06c-3.23.27-6.22-.9-7.6-2.11-.58-.51-.91-1.02-.93-1.49-.09-1.62,2.08-1.81,2.24-1.82h0s0,0,.01,0c0,0,0,0,0,0,0,0,.01,0,.02,0,.05-.01.1-.03.14-.07.04-.03.05-.07.07-.11,0-.01.02-.02.02-.03,0,0,0-.02,0-.02,0-.02.02-.03.02-.05,0-.03-.01-.06-.02-.08-.02-.07-.05-.13-.11-.18-.84-.64-1.76-.93-2.76-.93-1.94,0-4.16,1.08-7.02,2.79-2.68,1.61-4.53,2.22-6.25,2.22-.4,0-.79-.03-1.18-.09-.16-.03-.32.09-.34.26-.02.17.09.33.25.35.42.06.84.1,1.27.1,1.87,0,3.83-.67,6.55-2.3,1.4-.84,2.63-1.51,3.72-1.97-.24.28-.43.6-.54.95-.09.27-.13.55-.13.83,0,.44.1.89.31,1.34.07.16.26.22.41.15.16-.07.22-.26.15-.41-.17-.37-.25-.73-.25-1.07,0-.22.03-.44.1-.64h0c.32-.99,1.4-1.79,2.97-1.79.46,0,.97.07,1.51.23,0,0,0,0,0,0,.1.04.2.08.29.13-.97.25-2.08.91-2.01,2.27.03.62.42,1.27,1.12,1.88,1.33,1.15,4,2.28,7.01,2.28.33,0,.66-.01,1-.04.15-.01.26-.15.25-.3-.01-.15-.12-.27-.3-.25Zm-6.36-6.03v.07h0v-.07Z\"><\/path><path d=\"m3.09,11.33c-.04-.35-.06-.71-.06-1.07,0-2.66,1.08-5.07,2.82-6.81,1.75-1.74,4.15-2.82,6.81-2.82,2.66,0,5.07,1.08,6.81,2.82,1.74,1.74,2.82,4.15,2.82,6.81,0,1.14-.21,2.23-.57,3.25.21.02.43.02.65.03.35-1.03.54-2.13.54-3.28C22.92,4.59,18.33,0,12.66,0,7,0,2.4,4.59,2.4,10.26c0,.41.03.81.08,1.21.2-.04.4-.08.61-.14Z\"><\/path><path d=\"m19.4,17.26c-.48.01-.94.02-1.38.02-3.71,0-6.03-.42-7.38-1-.68-.29-1.11-.61-1.36-.91-.26-.31-.34-.6-.35-.88,0-.32.13-.63.32-.9.07-.1.08-.22.03-.33-.05-.11-.17-.17-.29-.17-1.18.04-2.18.37-3.26.67-1.08.31-2.24.61-3.77.62-.17,0-.31.14-.31.31s.14.31.31.31c1.61-.02,2.84-.33,3.93-.65.9-.26,1.7-.5,2.54-.6-.09.22-.14.46-.14.72,0,.42.15.87.49,1.28.51.61,1.42,1.13,2.89,1.51,1.47.38,3.52.62,6.34.62.45,0,.91,0,1.39-.02.17,0,.31-.15.3-.32,0-.17-.15-.31-.32-.3Z\"><\/path><\/g><\/svg><\/div><\/div>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-193a423410b004bf48b663574cbd0c0c\" style=\"color:#fafafa\"><strong>Optimised Cooling-System Performance<\/strong><\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-0c848ed31edd2dd777d6f454420b290f\" style=\"color:#fafafa\">Hidromod\u2019s detailed analysis of historical seawater temperatures and advanced hydrodynamic modelling ensures that the cooling system design is based on robust, accurate, site\u2011specific data. <\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-7a61f0e8f892f161e228c7769becc557\" style=\"color:#fafafa\">This optimisation supports stable thermal performance year\u2011round, helping Start Campus maintain its targeted WUE of zero and PUE of ~1.1.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-outermost-icon-block items-justified-left\"><div class=\"icon-container has-icon-color has-teal-color\" style=\"color:#0AC49A;width:60px;transform:rotate(0deg) scaleX(1) scaleY(1)\"><svg id=\"Layer_2\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"200\" height=\"200\" viewBox=\"0 0 22.7 24\"><g id=\"Layer_1-2\"><g><path d=\"M2.45,16.32c0,.19,.15,.34,.34,.34s.34-.15,.34-.34v-4.83l-.69,.69v4.14Z\"><\/path><path d=\"M4.88,16.32c0,.19,.15,.34,.34,.34s.34-.15,.34-.34v-7.26l-.69,.69v6.58Z\"><\/path><path d=\"M.02,13.68v2.65c0,.19,.15,.34,.34,.34s.34-.15,.34-.34v-2.66c-.12,.03-.24,.05-.36,.05-.11,0-.22-.02-.33-.04Z\"><\/path><path d=\"M14.89,9.83c.14,0,.27,.01,.41,.02V4.16l-.69,.69v5c.09,0,.18-.01,.28-.01Z\"><\/path><path d=\"M7.32,7.31v9.01c0,.19,.15,.34,.34,.34s.34-.15,.34-.34V7.29l-.33-.33-.35,.35Z\"><\/path><path d=\"M12.87,10.19v-3.6l-.69,.69v3.21c.22-.11,.45-.21,.69-.3Z\"><\/path><path d=\"M9.75,8.76v3.99c.2-.33,.43-.63,.69-.92v-3.08c-.11,.03-.23,.05-.35,.05s-.23-.02-.34-.05Z\"><\/path><path d=\"M.34,12.69c.09,0,.18-.03,.24-.1L7.67,5.5l2.18,2.18c.13,.13,.36,.13,.48,0L16.05,1.96c.13-.13,.13-.35,0-.48s-.35-.13-.48,0l-5.47,5.48-2.18-2.18c-.13-.13-.36-.13-.48,0L.1,12.11c-.13,.13-.13,.35,0,.48,.07,.07,.15,.1,.24,.1Z\"><\/path><path d=\"M14.34,.69h2.46V3.14c0,.19,.15,.34,.34,.34s.34-.15,.34-.34V.34c0-.19-.15-.34-.34-.34h-2.8c-.19,0-.34,.15-.34,.34s.15,.34,.34,.34Z\"><\/path><path d=\"M14.89,12.29c-2.01,0-3.65,1.67-3.65,3.73,0,.19,.15,.34,.34,.34s.34-.15,.34-.34c0-1.68,1.33-3.04,2.96-3.04,.19,0,.34-.15,.34-.34s-.15-.34-.34-.34Z\"><\/path><path d=\"M22.28,21.51l-2.71-2.78c.45-.8,.71-1.73,.71-2.71,0-3.04-2.41-5.51-5.38-5.51s-5.38,2.47-5.38,5.51,2.41,5.51,5.38,5.51c.96,0,1.87-.26,2.65-.72l2.7,2.77c.27,.28,.63,.43,1.02,.43h0c.38,0,.75-.15,1.02-.43,.56-.57,.56-1.49,0-2.06Zm-12.08-5.49c0-2.66,2.11-4.82,4.69-4.82s4.69,2.16,4.69,4.82-2.11,4.82-4.69,4.82-4.69-2.16-4.69-4.82Zm11.59,7.07c-.14,.14-.33,.22-.52,.22h0c-.2,0-.38-.08-.53-.22l-2.62-2.68c.4-.31,.76-.68,1.06-1.09l2.6,2.67c.3,.3,.3,.8,0,1.1Z\"><\/path><\/g><\/g><\/svg><\/div><\/div>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-f5563b774f5953f2ccaebb5a35d19089\" style=\"color:#fafafa\"><strong>Increased Operational Resilience<\/strong><\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-97484fbe717ad9b752e81120b8b46cbe\" style=\"color:#fafafa\">High\u2011resolution, detailed modelling of the intake basin and conditions, including interactions with the LNG terminal\u2019s cold\u2011water discharge, and outfall provides insights into mixing efficiency and operational risks. <\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-6b50e3ce6e66d11d70b7a4f29e1469ff\" style=\"color:#fafafa\">This helps anticipate and mitigate potential issues with adequate systems sizing to strengthen long-term reliability.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top has-teal-color has-text-color is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-outermost-icon-block items-justified-left\"><div class=\"icon-container has-icon-color has-teal-color\" style=\"color:#0AC49A;width:60px;transform:rotate(0deg) scaleX(1) scaleY(1)\"><svg id=\"Layer_2\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"200\" height=\"200\" viewBox=\"0 0 24 24\"><g id=\"Layer_1-2\"><path d=\"m12,0C5.38,0,0,5.38,0,12s5.38,12,12,12,12-5.38,12-12S18.62,0,12,0Zm10.37,16.5c0-.16,0-.34.02-.69.02-.3.05-.52.08-.68.05-.37.08-.61-.11-.87-.24-.31-.67-.47-1.33-.47-.12,0-.24,0-.36.01-.12,0-.21.02-.31.04-.05,0-.1.01-.16.01h-.13c-.08-.05-.2-.23-.39-.62-.23-.45-.36-.71-.38-.8,0,0-.2-.85.25-1.48.08-.11.14-.17.22-.23.11-.09.25-.21.39-.49.11-.2.15-.37.19-.5l.03-.1.08-.06h.06c.07,0,.17,0,.29,0h.15c.31-.01.45-.04.57-.06h.08s.15,0,.15,0c.45,0,.91-.46,1.08-.66.29,1,.45,2.05.45,3.14,0,1.6-.34,3.12-.94,4.5ZM15.33,2.12s.03.06.05.08l.05.06-.06.05s-.07.08-.1.13c-.06.1-.21.36-.21.36-.02.02-.05.04-.15.11l-.12.08c-.18.12-.3.19-.4.23l-.07.11-.07-.11c-.04-.06-.08-.19-.13-.33-.1-.3-.23-.7-.58-.97-.21-.16-.36-.21-.59-.29-.01-.03-.03-.07-.06-.14-.07-.18-.06-.48-.05-.75.43.03.85.08,1.26.16.73.18.81.34,1.22,1.23Zm-6.75-.89c.08.15.14.3.18.45.08.36.03.67-.01.96-.06.35-.11.72.19.96.18.14.38.15.53.15.14,0,.21,0,.3.1.02.04.05.07.1.14.18.21.43.27.66.32.22.05.32.08.35.14.06.11.08.25.05.25h0l.05.03v.06c-.04.17-.28.29-.66.46-.47.21-1.06.48-1.46,1.11-.19.31-.22.51-.23.65-.01.11-.02.14-.09.23-.34.44-1.06.49-1.7.52-.63.04-1.27.08-1.47.59-.1.26-.01.48.11.77.22.54.58.79.89,1.01.21.15.4.28.58.5.31.37.41.78.44.99l.03.16-.14-.07c-.18-.09-.34-.14-.51-.14-.07,0-.14,0-.2.02-.32.07-.47.28-.57.41-.05.07-.09.12-.13.14-.04.02-.09.02-.13.02-.08,0-.23-.02-.44-.1-.68-.27-1.54-1.05-1.88-2.01-.14-.41-.14-.68-.15-1.06,0-.39,0-.89-.19-1.64-.12-.51-.31-1-.56-1.48,1.41-2.17,3.54-3.84,6.06-4.64Zm6.4,16.35c0,.38,0,.59-.18.8-.12.14-.2.16-.37.2-.21.04-.5.11-.83.42-.47.43-.58.94-.68,1.35-.09.4-.15.61-.39.74-.06.04-.13.07-.24.12-.18.08-.4.18-.71.4-.01,0-.29.23-.46.52-.2.33-.2.65-.17.96v.14s-.11-.05-.11-.05c-.11-.05-.23-.12-.33-.2-.43-.35-.48-.87-.56-2.48-.03-.5-.06-1.09-.11-1.78-.17-2.16-.39-2.69-.85-3.14-.3-.3-.63-.46-.87-.59-.51-.26-.58-.36-.26-1.05.2-.17.42-.29.66-.37.21-.07.42-.1.64-.1.25,0,.51.05.76.14.17.06.23.1.42.25.14.11.32.25.64.47.82.56,1.32.9,1.93.98.09.01.16.01.23.01.19,0,.33-.03.49-.08.16-.04.35-.09.71-.12.21-.02.42-.02.6-.02.42,0,.73.03.89.07l.13.05-.1.11c-.16.17-.4.42-.6.81-.29.58-.28,1.07-.28,1.46Zm-2.97,5.73c-.12,0-.23-.01-.35-.02,0-.08,0-.15-.01-.22-.02-.2-.04-.4.07-.59.09-.15.24-.29.28-.32.25-.17.43-.26.6-.33.1-.04.19-.09.28-.14.52-.29.63-.79.73-1.2.08-.36.16-.71.47-1,.19-.18.32-.2.5-.24.22-.05.49-.1.76-.43.35-.42.35-.87.34-1.26,0-.36-.01-.71.21-1.14.15-.3.33-.48.48-.64.19-.19.42-.43.3-.78-.14-.41-.7-.62-1.67-.62-.21,0-.44,0-.69.03-.42.03-.66.1-.84.14-.12.03-.2.05-.3.05-.04,0-.09,0-.15-.01-.43-.06-.81-.31-1.63-.87-.3-.2-.47-.34-.6-.44-.21-.16-.33-.26-.61-.36-.33-.12-.67-.18-1-.18-.29,0-.58.05-.86.14-.36.12-.69.31-.97.56l-.09.13c-.59,1.29-.12,1.66.56,2.01.24.12.48.25.7.47.27.27.48.61.64,2.7.05.69.08,1.28.11,1.79.06,1.22.1,1.97.43,2.51C4.55,21.99.69,17.44.69,12c0-1.96.5-3.81,1.39-5.42.13.3.24.61.32.93.17.69.17,1.11.17,1.49,0,.39,0,.77.19,1.28.42,1.21,1.45,2.09,2.27,2.42.25.1.49.15.7.15.17,0,.32-.03.45-.1.18-.09.29-.24.37-.34.08-.11.11-.14.22-.16.1,0,.22.07.36.16.12.08.28.18.46.18.08,0,.16-.02.23-.07.1-.06.22-.18.27-.45.08-.48-.1-1.28-.6-1.9-.24-.3-.5-.47-.73-.64-.28-.2-.51-.36-.66-.75-.01-.04-.04-.1.02-.11l-.08-.14c.12-.08.45-.1.84-.13.74-.05,1.67-.1,2.2-.79.18-.23.21-.4.23-.58.01-.11.03-.19.13-.36.29-.45.73-.65,1.16-.85.44-.2.95-.43,1.04-.97.02-.08.03-.47-.17-.81-.2-.33-.54-.4-.81-.46-.09-.02-.23-.05-.32-.14-.03-.05-.07-.1-.15-.18-.27-.24-.55-.24-.72-.24h-.09s.03-.24.04-.31c.05-.31.11-.73,0-1.21-.04-.17-.1-.33-.17-.48.88-.22,1.8-.35,2.74-.35.05,0,.1,0,.15,0-.02.34-.03.72.09,1.04.16.41.31.55.61.61.08.02.14.03.27.12.17.13.26.39.34.63.1.32.22.68.58.8.07.02.15.04.23.04.32,0,.66-.2.91-.38l.11-.08c.25-.17.3-.21.43-.44l.15-.21c.3-.05.47-.22.5-.52.03-.27-.21-.4-.37-.5l-.06-.04v-.02c-.09-.16-.16-.3-.22-.43,3.17,1.11,5.7,3.58,6.87,6.72-.06.1-.13.21-.2.3-.24.28-.49.45-.59.48-.02,0-.06,0-.14,0-.02,0-.04,0-.06,0-.06,0-.12.01-.18.02-.09.02-.2.04-.45.04h-.15c-.1,0-.17,0-.26,0h-.13c-.11,0-.23,0-.37.1-.24.15-.3.37-.36.56-.03.1-.06.22-.13.36-.08.15-.13.19-.23.28-.09.08-.21.18-.34.36-.61.86-.39,1.92-.36,2.04.04.16.15.38.45.98.21.42.45.89.9.97.07.01.16.01.24.01.09,0,.17-.01.27-.03.06,0,.13-.02.23-.02.12,0,.23-.01.32-.01.36,0,.62.06.77.21,0,.05,0,.14-.03.34-.02.18-.06.41-.08.72-.03.4-.03.6-.02.79,0,.12,0,.24-.01.42-.05.53-.21,1.07-.49,1.61-2.05,2.86-5.4,4.73-9.18,4.73Z\"><\/path><path d=\"m11.39,11.79s-.1-.02-.15-.02c-.02,0-.04,0-.07,0-.03,0-.06,0-.11,0l-.08-.06c-.16-.11-.38-.18-.57-.18-.06,0-.11,0-.15.02-.1.03-.2.12-.23.21-.07.18.01.38.19.45.04.02.08.03.13.03h.12s.1.02.18.08c.05.04.12.1.24.14.05.02.1.02.16.02.03,0,.06,0,.1,0l.1.03.11.11c.07.07.15.1.25.1s.18-.04.24-.1c.07-.06.1-.15.1-.24,0-.09-.04-.18-.1-.24-.23-.23-.3-.31-.46-.35Z\"><\/path><\/g><\/svg><\/div><\/div>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-ef102961947a3623c956639c6c37bc2c\" style=\"color:#fdfdfd\"><strong>Enhanced Environmental Compliance<\/strong><\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-a8ecfb0dd37f2a26eb7e062e3fcd68be\" style=\"color:#fdfdfd\">By simulating the thermal plume and assessing compliance with regulatory thresholds, Hidromod enables the project team to demonstrate adherence to environmental requirements and the Environmental Impact Assessment. <\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-30055fabd56ab66ede3e729dfe851a7e\" style=\"color:#fdfdfd\">This ensures that the seawater cooling system operates without adverse ecological impact.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-outermost-icon-block items-justified-left\"><div class=\"icon-container has-icon-color has-teal-color\" style=\"color:#0AC49A;width:60px;transform:rotate(0deg) scaleX(1) scaleY(1)\"><svg id=\"Layer_2\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"200\" height=\"200\" viewBox=\"0 0 24 22.94\"><g id=\"Layer_1-2\"><g><path d=\"M21.76,9.85H12.97s0,0,0,0c-.09,0-.18,.04-.24,.1-.06,.06-.1,.15-.1,.24v3.47s.69-.32,.69-.32v-2.81s8.11,0,8.11,0v2.81s.69,.32,.69,.32v-3.47c0-.19-.15-.34-.34-.34Z\"><\/path><path d=\"M17.09,12.37l-5.49,2.51c-.22,.1-.38,.28-.47,.5-.08,.22-.07,.46,.02,.66l2.08,4.91,.63-.27-2.08-4.92c-.03-.06-.02-.11,0-.14,.02-.05,.06-.09,.11-.11l5.48-2.51,5.49,2.52c.05,.02,.09,.06,.11,.11,.01,.03,.02,.08-.01,.15l-2.07,4.91,.63,.27,2.07-4.9c.1-.21,.11-.45,.03-.67-.08-.22-.25-.4-.46-.5l-5.49-2.52c-.18-.08-.38-.08-.56,0Z\"><\/path><rect x=\"17.02\" y=\"13.89\" width=\".69\" height=\"6.33\" rx=\".34\" ry=\".34\"><\/rect><path d=\"M18.77,9.13v-2.02c0-.09-.03-.18-.1-.24-.06-.06-.15-.1-.24-.1h-2.12s0,0,0,0c-.09,0-.18,.04-.24,.1-.06,.06-.1,.15-.1,.24v2.02s.69,0,.69,0v-1.67s1.43,0,1.43,0v1.67s.69,0,.69,0Z\"><\/path><path d=\"M22.65,21.7c-.26,.26-.45,.45-.87,.45s-.6-.19-.86-.45c-.29-.29-.65-.64-1.35-.64s-1.06,.36-1.35,.64c-.26,.26-.45,.45-.86,.45s-.6-.19-.86-.45c-.29-.29-.65-.64-1.35-.64s-1.06,.36-1.35,.64c-.26,.26-.45,.45-.86,.45s-.6-.19-.86-.45c-.29-.29-.65-.64-1.35-.64v.69c.41,0,.6,.19,.86,.45,.29,.29,.65,.64,1.35,.64s1.06-.36,1.35-.64c.26-.26,.45-.45,.86-.45s.6,.19,.86,.45c.29,.29,.65,.64,1.35,.64s1.06-.36,1.35-.64c.26-.26,.45-.45,.86-.45s.6,.19,.87,.45c.29,.29,.65,.64,1.35,.64s1.06-.36,1.35-.64c.26-.26,.45-.45,.87-.45v-.69c-.69,0-1.06,.36-1.35,.64Z\"><\/path><path d=\"M9.38,17.8H.34c-.19,0-.34,.15-.34,.34s.15,.34,.34,.34H9.04v4.1c0,.19,.15,.34,.34,.34s.34-.15,.34-.34v-4.45c0-.19-.15-.34-.34-.34Z\"><\/path><path d=\"M1.63,12.25c-.19,0-.34,.15-.34,.34v4.61h.69v-4.26H7.69v-.34h0V5.57h-.69v6.68H1.63Z\"><\/path><path d=\"M9.73,.82l7.92,2.68h2.15L9.49,.02c-.18-.06-.38,.04-.44,.22-.01,.04-.01,.07-.01,.11h0V3.51h.69V.82Z\"><\/path><path d=\"M7,.95V3.51h.69V.34h0c0-.06,0-.12-.04-.18-.1-.16-.31-.22-.47-.12L1.4,3.51h1.34L7,.95Z\"><\/path><rect x=\"9.04\" y=\"5.57\" width=\".69\" height=\"11.55\"><\/rect><path d=\"M.34,7.8H3.38c.19,0,.34-.15,.34-.34v-1.9h-.69v1.55H.69v-2.23H21.42v3.18c0,.19,.15,.34,.34,.34s.34-.15,.34-.34v-3.52c0-.19-.15-.34-.34-.34H.34c-.19,0-.34,.15-.34,.34v2.91c0,.19,.15,.34,.34,.34Z\"><\/path><\/g><\/g><\/svg><\/div><\/div>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-594827a18b96f7c0f330878dcf7b0e0d\" style=\"color:#fdfdfd\"><strong>Future-Proofed System Design<\/strong><\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-e5d8cfb6bff6bba0214f06ffb1c51dca\" style=\"color:#fdfdfd\">By incorporating future port expansion scenarios, Hidromod ensures that the cooling system remains robust against future changes in the surrounding marine environment. <\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-c4702c7bca59b9fb7a6bc3e7b103ffdc\" style=\"color:#fdfdfd\">This forward-looking approach protects system efficiency and reduces the likelihood of unexpected performance degradation due to infrastructure interactions.<\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-small-font-size wp-elements-0b6eed85a62c101443f9f1cc6d46be6b\" style=\"color:#fdfdfd\"><\/p>\n\n\n\n<p class=\"has-lightgrey-color has-text-color has-small-font-size\"><\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-cover alignfull has-parallax\"><div class=\"wp-block-cover__image-background wp-image-126235 size-full has-parallax\" style=\"background-position:50% 50%;background-image:url(https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg)\"><\/div><span aria-hidden=\"true\" class=\"wp-block-cover__background has-blue-background-color has-background-dim-70 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-constrained wp-block-cover-is-layout-constrained\">\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>\u201cSeawater cooling is fundamental to our strategy to deliver sustainable, large-scale digital infrastructure in Sines and beyond. As we scale towards gigawatt capacity, it is essential that innovation goes hand in hand with environmental responsibility \u2013 ensuring we can support the growth of AI and digital economies without compromising natural resources.\u201d<\/p>\n<\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Rob Dunn, CEO,\u00a0<a href=\"https:\/\/www.startcampus.pt\/\" target=\"_blank\" rel=\"noreferrer noopener\">Start Campus<\/a><\/p>\n<\/blockquote>\n<\/div><\/div>\n\n\n\n<div style=\"height:48px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-learn-more-about-start-campus\">Learn more about Start Campus<\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link has-limegreen-color has-text-color has-link-color wp-element-button\" href=\"https:\/\/www.startcampus.pt\/\" target=\"_blank\" rel=\"noreferrer noopener\">Start Campus<\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-learn-more-about-hidromod-part-of-abl\">Learn more about Hidromod, part of ABL<\/h2>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link has-blue-color has-text-color has-link-color wp-element-button\" href=\"https:\/\/hidromod.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Hidromod<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"author":20,"featured_media":126235,"template":"","sector":[960],"service":[1049,957],"company":[724,1025],"class_list":["post-126241","case-study","type-case-study","status-publish","has-post-thumbnail","hentry","sector-software","service-numerical-modelling","service-software","company-abl","company-hidromod"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.6 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus - ABL<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus\" \/>\n<meta property=\"og:description\" content=\"Project Introduction Hidromod, part of ABL, provided advanced technical advisory support and specialist hydrodynamic modelling for the seawater cooling system of a data centre developed by Start Campus in Sines, Portugal. The work, led by the Hidromod team, based in Portugal, combined historical oceanographic data analysis, advanced numerical modelling, and environmental compliance studies to support [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/\" \/>\n<meta property=\"og:site_name\" content=\"ABL\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-02T15:34:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"601\" \/>\n\t<meta property=\"og:image:height\" content=\"401\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/\",\"name\":\"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus - ABL\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Start-campus-1.jpg\",\"datePublished\":\"2026-04-02T15:02:04+00:00\",\"dateModified\":\"2026-04-02T15:34:16+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/#primaryimage\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Start-campus-1.jpg\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Start-campus-1.jpg\",\"width\":601,\"height\":401},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/case-studies\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#website\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"name\":\"ABL\",\"description\":\"The Energy and Marine Consultants\",\"publisher\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#organization\",\"name\":\"ABL-Group\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"contentUrl\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/ABL-v2-logo.png\",\"width\":481,\"height\":214,\"caption\":\"ABL-Group\"},\"image\":{\"@id\":\"https:\\\/\\\/abl-group.com\\\/abl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus - ABL","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/","og_locale":"en_GB","og_type":"article","og_title":"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus","og_description":"Project Introduction Hidromod, part of ABL, provided advanced technical advisory support and specialist hydrodynamic modelling for the seawater cooling system of a data centre developed by Start Campus in Sines, Portugal. The work, led by the Hidromod team, based in Portugal, combined historical oceanographic data analysis, advanced numerical modelling, and environmental compliance studies to support [&hellip;]","og_url":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/","og_site_name":"ABL","article_modified_time":"2026-04-02T15:34:16+00:00","og_image":[{"width":601,"height":401,"url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/","url":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/","name":"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus - ABL","isPartOf":{"@id":"https:\/\/abl-group.com\/abl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/#primaryimage"},"image":{"@id":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/#primaryimage"},"thumbnailUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg","datePublished":"2026-04-02T15:02:04+00:00","dateModified":"2026-04-02T15:34:16+00:00","breadcrumb":{"@id":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/#primaryimage","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2026\/04\/Start-campus-1.jpg","width":601,"height":401},{"@type":"BreadcrumbList","@id":"https:\/\/abl-group.com\/abl\/case-studies\/advanced-hydrodynamic-modelling-for-seawater-cooling-at-start-campus-data-campus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/abl-group.com\/abl\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/abl-group.com\/abl\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Advanced Hydrodynamic modelling for Seawater Cooling at Start Campus Data Campus"}]},{"@type":"WebSite","@id":"https:\/\/abl-group.com\/abl\/#website","url":"https:\/\/abl-group.com\/abl\/","name":"ABL","description":"The Energy and Marine Consultants","publisher":{"@id":"https:\/\/abl-group.com\/abl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/abl-group.com\/abl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/abl-group.com\/abl\/#organization","name":"ABL-Group","url":"https:\/\/abl-group.com\/abl\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/","url":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","contentUrl":"https:\/\/abl-group.com\/abl\/wp-content\/uploads\/2023\/06\/ABL-v2-logo.png","width":481,"height":214,"caption":"ABL-Group"},"image":{"@id":"https:\/\/abl-group.com\/abl\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/case-study\/126241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/types\/case-study"}],"author":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/users\/20"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media\/126235"}],"wp:attachment":[{"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/media?parent=126241"}],"wp:term":[{"taxonomy":"sector","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/sector?post=126241"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/service?post=126241"},{"taxonomy":"company","embeddable":true,"href":"https:\/\/abl-group.com\/abl\/wp-json\/wp\/v2\/company?post=126241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}